DSS-EULP Coupling Pipeline

Open-data coupling of SMART-DS synthetic distribution feeders with NREL End-Use Load Profiles (EULP) for distribution system planning under uncertainty.

Configuration

Each value has one owner:

  • configs/local.yaml holds the machine paths: smart_ds_base, eulp_metadata_root, runs_root and evwatts_extract_dir (see "EV cars"), openei_api_key_file for the tariff fetch only (see "EV control"), and nhts2017_csv_dir and evwatts_raw_dir for the two extract scripts only. Copy it from configs/local.yaml.example.
  • A case file in configs/cases/ names a topology, a donor and execution.max_feeders. configs/topology_registry.yaml and configs/donor_registry.yaml hold the values of each topology and donor, such as the feeder folder, the donor state and eulp_download_date.
  • configs/defaults.yaml holds the seasons, the phase order and mixes_file.
  • configs/growth.yaml holds the load growth settings: growth_years (default 0, growth off), the growth rates, the infill share, the companion businesses, the named loads and the planning limits (see "Load growth over planning years").
  • pipeline_config.yaml holds the method parameters: random_seed, skip_circuits, quota, eulp_release (the ResStock and ComStock release names with their OEDI years residential_year and commercial_year, see "Settings from a caller"), der_sizing (PV and storage hosts, sizes and control, see "PV and storage"), peak_day_rule (default per_circuit; per_group, given and per_substation remain available, see "Peak-day rules"), heating_label_unit (default building; customer remains available, see "Heating labels and EV hosts"), voltage_band (the band for the load voltage summaries), ev_cars, ev_home_window, ev_day and ev_work_share_case (defaults evwatts_sessions, true, typical and moderate, see "EV cars"), and ev_control and ev_valley_base (defaults valley_fill_feeder and buildings_only, see "EV control").

run_case.py resolves these files and passes the run values to each script as PIPELINE_* environment variables. docs/workflow.md, section 3.4, lists them. A script that reads a run value whose variable is not set exits 1 and names the variable. Run the pipeline through run_case.py.

The primary runnable scripts are state-agnostic.

Pipeline Phases

Phase Folder Purpose
pre 0_download_smartds/ Register the SMART-DS feeders, scan their loads and check them for the defects of the repairs. download_smartds.py downloads the feeders from OEDI outside the phases
0 0_experimental_design/ Hold the fixed mixes (mixes_fixed.yaml). The mixes file is an input; https://github.com/DeltaE/j-uncertainty-grid-modernisation writes the mixes file of a designed experiment
1 1_data_provenance/ Build state-specific EULP metadata CSVs
2 2_circuit_matching/ Flatten SMART-DS feeders and review parquet matches
3 3_tolerance_matching/ Match feeder peaks to EULP buildings. A loadshape that matches no building within the largest tolerance takes the buildings of the next 5 % step that matches
4 4_quota_assignment/ Filter, stratify, and select representative buildings. A case with only homes or only businesses runs every phase; the Phase 3 and Phase 4 files of the sector without loads hold a header and no rows
growth growth_plan.py Plan the load growth of the planning year from configs/growth.yaml. Writes nothing with growth_years: 0
5a 5a_eulp_downloads/ Download EULP parquet profiles from OEDI
5b 5b_profile_generation/ Build baseline, dm and uncontrolled peak-day parquet slices
5c 5c_csv_conversion/ Convert daily parquet slices to OpenDSS CSV loadshapes
5d 5d_scenario_controls/ Pick each building's dm and uncontrolled (un) profile. dm is a heat pump that keeps a fuel backup: ResStock upgrade 4 (upgrade 1 for a home heated by electricity, to which upgrade 4 does not apply), ComStock upgrade 2 or 9. un is a heat pump with electric backup: ResStock upgrade 1, ComStock upgrade 1 or 8
6 6_kvar_preparation/ Prepare kvar ratios and kvar CSV loadshapes
7 7_circuit_instantiation/ Instantiate circuits and run OpenDSS batches
8 8_results_analysis/ Aggregate monitor outputs and append experiment outputs

The upgrade names are in the OEDI lookup files of each release: https://oedi-data-lake.s3.amazonaws.com/nrel-pds-building-stock/end-use-load-profiles-for-us-building-stock/2024/resstock_tmy3_release_2/upgrades_lookup.json and https://oedi-data-lake.s3.amazonaws.com/nrel-pds-building-stock/end-use-load-profiles-for-us-building-stock/2024/comstock_amy2018_release_1/upgrades_lookup.json. The code keys stay dm, uncontrolled and demand_management.

Prerequisites

  • Python 3.11 with pip install -r requirements.txt.
  • SMART-DS feeder data from OEDI, with smart_ds_base in configs/local.yaml pointing to the data root.
  • OEDI / NREL EULP metadata and profile access. The download scripts use public OEDI S3 endpoints.
  • Enough local disk for parquet and CSV profile data.
  • Windows + OpenDSS installed for phase 7 (comtypes uses the OpenDSS COM interface).

Prerequisites for a cold clone

Copy configs/local.yaml.example to configs/local.yaml. Set the machine paths: smart_ds_base for the SMART-DS data root and eulp_metadata_root for the EULP metadata data root.

The pipeline resolves two SMART-DS topologies under smart_ds_base. Each provides a base_timeseries/opendss/<feeder> tree and a co-located parquet_data pool:

  • GSO/urban-suburban/ (feeder uhs13_1247)
  • AUS/P2U/ (feeder p2uhs12_1247)

Place the four EULP baseline metadata CSVs at these paths under eulp_metadata_root:

  • Metadata_NC_Residential/NC_baseline_metadata_and_annual_results.csv
  • Metadata_NC_Commercial/NC_baseline_metadata_and_annual_results.csv
  • Metadata_TX_Residential/TX_baseline_metadata_and_annual_results.csv
  • Metadata_TX_Commercial/TX_baseline_metadata_and_annual_results.csv

Keep the file names exactly as downloaded, because Phase 1 writes them into its outputs.

The EV cars of the default ev_cars: evwatts_sessions, and of session_rows, need the EV WATTS public database (https://doi.org/10.15483/1970735). Create a free account at https://livewire.energy.gov/ds/evwatts/evwatts.public and download its session and evse tables (evwatts.public.session.csv, evwatts.public.evse.csv). Set evwatts_raw_dir to their folder and evwatts_extract_dir to a folder outside the repository, then run python 7_circuit_instantiation/build_evwatts_extract.py from the repository root, once as is for the residential extract and a second time with --venue office for the Business Office extract that the work cars draw from. The EV WATTS data stays outside the repository. The 2017 NHTS extract in 7_circuit_instantiation/data_ev_cars/ is tracked; python 7_circuit_instantiation/build_nhts_extract.py rebuilds it from https://nhts.ornl.gov/assets/2016/download/Csv.zip, unpacked into the folder that nhts2017_csv_dir names. A run with horizon_days above 1, the default, also needs the weekend residential extract: run python 7_circuit_instantiation/build_evwatts_extract.py --day-type weekend once (see "The multi-day window"). --venue office --day-type weekend builds the office weekend extract, which no run reads; it backs the weekend shares in ev_inputs.yaml. The NHTS weekend extract is tracked; build_nhts_extract.py --day-type weekend rebuilds it.

Each CSV downloads directly from OEDI. Each URL returns the exact bytes the pipeline uses:

Run these eight commands from the repository root:

python run_case.py --case configs/cases/NC_GSO_urban__NC.yaml --all --season summer
python run_case.py --case configs/cases/NC_GSO_urban__TX.yaml --all --season summer
python run_case.py --case configs/cases/TX_AUS_urban__NC.yaml --all --season summer
python run_case.py --case configs/cases/TX_AUS_urban__TX.yaml --all --season summer
python run_case.py --case configs/cases/NC_GSO_urban__NC.yaml --all --season winter
python run_case.py --case configs/cases/NC_GSO_urban__TX.yaml --all --season winter
python run_case.py --case configs/cases/TX_AUS_urban__NC.yaml --all --season winter
python run_case.py --case configs/cases/TX_AUS_urban__TX.yaml --all --season winter

Then run these three scripts from the repository root:

python gather_m2_cases.py
python validate_2x2.py
python gen_results_table.py
  • gather_m2_cases.py stacks the eight aggregate_m2_combined.csv files into <runs_root>/m2_all_cases_all_seasons.csv.
  • validate_2x2.py prints the cross-case checks on that file and writes <runs_root>/peaks_per_combo.csv.
  • gen_results_table.py writes Table 2 as table2.csv and table2.md to <runs_root>/.

Each run writes its workspace to <runs_root>/<case>/<season>/workspace/. --all refuses to start when the workspace of any requested season already exists. --dry-run prints the resolved variables and every command, and writes nothing.

Reproduction record

Verified on 2026-11-24. A fresh clone at 927aa92 reproduced all eight case-seasons on Windows, with Python 3.11.7 and OpenDSS 9.8.0.1 through the COM interface, against a second fresh clone at the same commit. The comparison covered 357,756 output files. All matched byte for byte, apart from three classes left out because they record the run and not its results. The 16 run_log.txt files record the start time, the paths of the run and the time each step took. The eight resolved_case.yaml files record the start time. The 48 copies of power_flow_sim_daily_EV_STO_DG_deploy.py in the circuit folders record the path of their clone in the line ROOT.

Run Sequence

run_case.py runs every phase with the PIPELINE_* variables set. To run one phase by hand, run it through run_case.py from the repository root. --phase <id> runs that phase in the existing workspace:

python run_case.py --case <case> --phase <id> --season <season>

--all runs these phases in this order:

python run_case.py --case <case> --phase pre --season <season>          # SMART-DS registry and load scan
python run_case.py --case <case> --phase 1 --season <season>            # EULP metadata
python run_case.py --case <case> --phase 2 --season <season>            # circuit matching
python run_case.py --case <case> --phase 3 --season <season>            # tolerance matching
python run_case.py --case <case> --phase 4 --season <season>            # quota assignment
python run_case.py --case <case> --phase growth --season <season>       # load growth plan; real work only with growth_years above 0
python run_case.py --case <case> --phase 5a --season <season>           # EULP parquet downloads
python run_case.py --case <case> --phase 5b --season <season>           # baseline profiles
python run_case.py --case <case> --phase 5d --season <season>           # scenario controls (combine_scenarios.py)
python run_case.py --case <case> --phase 5b_variants --season <season>  # DM and uncontrolled profiles
python run_case.py --case <case> --phase 5c --season <season>           # CSV conversion
python run_case.py --case <case> --phase 5c_variants --season <season>  # CSV conversion, DM and uncontrolled
python run_case.py --case <case> --phase 6 --season <season>            # kvar preparation
python run_case.py --case <case> --phase 6_variants --season <season>   # kvar preparation, DM and uncontrolled
python run_case.py --case <case> --phase mix_days --season <season>     # circuit days and their profiles; nothing under per_group
python run_case.py --case <case> --phase 7a --season <season>           # profile bridge and mixes copy
python run_case.py --case <case> --phase 7b --season <season>           # circuit instantiation
python run_case.py --case <case> --phase 7c --season <season>           # OpenDSS runs
python run_case.py --case <case> --phase 8 --season <season>            # aggregation and results

configs/phases.yaml lists the scripts of each phase. Each phase reads the outputs of the phases before it, so a hand run starts with pre in an empty workspace.

These steps are outside the phases:

# Download SMART-DS from OEDI into <smart_ds_base>/<region>/<subregion>/.
python .\0_download_smartds\download_smartds.py `
  --regions GSO AUS `
  --subregions urban-suburban P2U `
  --scenarios base_timeseries `
  --skip-profiles `
  --output-dir <smart_ds_base>

The saved time-of-use rates in 7_circuit_instantiation/data_tariffs/ are tracked, so a cold clone needs no API key. To fetch them again, set openei_api_key_file in configs/local.yaml to a text file that holds an OpenEI API key and run python 7_circuit_instantiation/fetch_tou_rates.py from the repository root. --all does not run it.

The mixes file is an input. Phase 7a copies the file that mixes_file in configs/defaults.yaml names, by default 0_experimental_design/mixes_fixed.yaml, and first removes any other mixes.yaml, mixes.yml or mixes.json an earlier run left in the workspace. https://github.com/DeltaE/j-uncertainty-grid-modernisation writes the mixes file of a designed experiment.

Settings from a caller

A program that calls this repository can change settings without editing its files. In this example the folder my_settings/ sets the low work share and the runs folder.

  1. The caller writes only the keys it changes, in files named as the repository's settings files: topology_registry.yaml, donor_registry.yaml, defaults.yaml, local.yaml, pipeline_config.yaml and growth.yaml. Here my_settings/pipeline_config.yaml holds ev_work_share_case: low and my_settings/local.yaml holds runs_root: <folder>.
  2. python run_case.py --case configs/cases/NC_GSO_urban__NC.yaml --all --settings my_settings checks the folder and the key paths before any phase runs. It stops with [FAIL] on a missing folder, on a .yaml or .yml file with another name, on a file that is not a mapping, on a key that is a mapping on one side only, and on a key path of pipeline_config.yaml or a top-level key of defaults.yaml that the repository's file lacks. growth.yaml is merged over configs/growth.yaml and is strict as pipeline_config.yaml, except under its maps infill_share_metro and block_attach_buses, which take new keys. Other files, such as a README, are ignored.
  3. Each settings file is merged over the repository's file of the same name. Mappings merge key by key. Any other value (a number, a string, a list, null) replaces the repository's value. The registries and local.yaml take new keys, such as a new topology, a new donor or a machine path. configs/local.yaml may be absent when the folder holds local.yaml.
  4. The merged values reach run_case.py and, through PIPELINE_SETTINGS_DIR, every phase: pipeline_utils.load_config merges the folder's pipeline_config.yaml in each script, and pipeline_utils.load_growth its growth.yaml.
  5. run_case.py prints the folder and the key paths of each settings file. <run_dir>/resolved_case.yaml gains a settings block with the folder and the key paths of each file, and <run_dir>/settings/ holds a copy of each settings file.

The folder may also hold given_days.csv, the day the caller gives each feeder and season under peak_day_rule: given (see "Peak-day rules").

Without --settings a run is as before.

eulp_release in pipeline_config.yaml names the ResStock and ComStock releases and their OEDI year folders (residential_year and commercial_year, both 2024). The current releases, 2024 resstock_tmy3_release_2 and 2024 comstock_amy2018_release_1, keep the folder names Metadata_<ST>_Residential, Metadata_<ST>_Commercial, parquet_residential_short_<date>_<ST> and parquet_commercial_<date>_comm_<ST>. Any other release adds _<year>_<release> to the metadata folder and to the download folder of its dataset, so the files of two releases never mix. Phase 1 stops with [FAIL] when the metadata folder of such a release is missing under eulp_metadata_root.

Repairs of the SMART-DS release

Some feeders of the SMART-DS v0.9 Full Texas 2018 release contradict their own files, and OpenDSS cannot solve them as released or solves them at the wrong voltage. smartds_repairs.py holds one named repair for each of three such defects. Each repair has a detection rule that reads only the feeder's own files, a change that writes only values read from those files or computed from them, and a reason. Phase pre checks every feeder of the case, read only on the staged files. Phase 7b makes the change on the run's own copy of each feeder in its circuit folder. The staged files are never written, and a feeder without a defect runs as before.

  • head_meters_on_regulator. Detection: monitor.m1, monitor.m2 or energymeter.m3 of Master.dss names an element Line.<name>, and no New Line.<name> statement exists in the feeder folder. The repair exists when exactly one transformer of the feeder is a regulator, a transformer with two or more windings that all have the same kV, with its first winding on the source bus (bus1 of the New Circuit statement), and that transformer is named trans_<name>. Change: in each of the three statements the element becomes Transformer.<the regulator's name as Transformers.dss writes it>, and nothing else in the statement changes. Reason: the meters name the head regulator under the class Line, so OpenDSS finds no element to meter. For example, the Master.dss of p175uhs2_1247--p175udt21772 meters Line.reg_creguladortension(r:p175udt21772-p175uhs2_1247), and its Transformers.dss defines Transformer.trans_reg_creguladortension(r:p175udt21772-p175uhs2_1247) (https://oedi-data-lake.s3.amazonaws.com/SMART-DS/v0.9/2018/Full_Texas/P175U/scenarios/base_timeseries/opendss/p175uhs2_1247/p175uhs2_1247--p175udt21772/Master.dss and Transformers.dss in the same folder).
  • source_voltage_from_transformers. The transformer voltage of a feeder: for each transformer that is not a regulator, take its winding of the highest kV (the first on a tie). When the transformer has phases=1 and that winding's bus names exactly one phase node (a node other than 0), the winding is rated line to neutral and its line-to-line value is kV x sqrt(3); otherwise it is kV. The transformer voltage is the largest such value on the feeder. Detection: basekV of the New Circuit statement and the transformer voltage differ. Change: basekV takes the rounded transformer voltage. In Set Voltagebases the old basekV value is removed, the new value is added when the list does not hold it, and the list is written in ascending order, each kept value as the release writes it. A Master.dss without Set Voltagebases gets the basekV change only. Reason: the source then holds the voltage the feeder's own transformers are rated for. For example, p3rhs8_25--p3rdt3710 sets basekV=12.47 and its single-phase transformers are rated 14.434 kV, line to neutral of 25 kV (https://oedi-data-lake.s3.amazonaws.com/SMART-DS/v0.9/2018/Full_Texas/P3R/scenarios/base_timeseries/opendss/p3rhs8_25/p3rhs8_25--p3rdt3710/Master.dss and Transformers.dss in the same folder). A feeder with no such transformer is not checked.
  • regulator_settings_from_voltage. The feeder voltage V: the transformer voltage rounded to 2 decimals, else basekV of the New Circuit statement; a feeder with neither is not checked. Each regulator is judged by the phase nodes its windings sit on (a bus that names no node has the unit's phases, 3 when phases is not written) and their conn (wye when not written). A single-phase unit on one phase node with wye windings fits kV V / sqrt(3) and monitors V / sqrt(3). A single-phase unit on two phase nodes fits kV V and monitors V. A three-phase unit on three phase nodes fits kV V and monitors V / sqrt(3) with wye windings, V with delta windings. A regulator of any other shape is not judged, and phase pre counts it in its summary line. Detection: a winding kV of the regulator, or the ptratio of a New RegControl statement that names it, is more than 1 percent from the value it fits. Change: each such winding kV, in the form the file writes it (kv= per wdg, or an entry of kvs=), takes the fitting kV rounded to 3 decimals, and each such ptratio takes the monitored voltage in volts / 120. Nothing else in the statement changes. A RegControl without ptratio is not checked, and phase pre counts it. Reason: OpenDSS divides the voltage of the monitored winding, line to neutral on a wye winding, by ptratio and holds the result at vreg, whose default is 120 V (https://opendss.epri.com/Properties23.html; a regulator on a 12.47 kV system takes ptratio=60, https://opendss.epri.com/RegControl.html). A ptratio of another voltage basis drives the taps to an end, and a winding kV of another basis gives the regulator another impedance and rating. For example, Regulators.dss of p43rhs9_25--p43rdt12492 gives RegControl.reg_creguladortension(r:p43rdt10888-p43rdt1336) ptratio=69.44465262857685, about 14,434 / sqrt(3) / 120, for a single-phase regulator on one phase node rated 14.434 kV on a 25 kV feeder, where 14,434 / 120 = 120.28 fits (https://oedi-data-lake.s3.amazonaws.com/SMART-DS/v0.9/2018/Full_Texas/P43R/scenarios/base_timeseries/opendss/p43rhs9_25/p43rhs9_25--p43rdt12492/Regulators.dss and Transformers.dss in the same folder).

ASSUMPTION: basekV and the transformer voltage are compared at 2 decimals, because the release writes a line-to-neutral rating with 3 decimals (14.434 kV for a 25 kV system gives 14.434 x sqrt(3) = 25.0004 kV). A comparison at more decimals would flag every such feeder, and one at fewer would pass a feeder whose source and transformers differ by up to 0.05 kV.

ASSUMPTION: a regulator's winding kV and ptratio are rewritten only when more than 1 percent from the values they fit. The release writes a line-to-neutral rating to 3 decimals and full-precision ratios, so a 1 percent margin passes every value that differs only by rounding (ptratio 60.0 against 59.996) and catches a wrong voltage basis (69.44 against 120.28; 12.47 kV against 7.2 kV). A rewritten winding kV takes 3 decimals, as the release writes its line-to-neutral ratings (14.434, 7.2).

Each changed statement prints one line, in phase pre for what Phase 7b will change and in Phase 7b for what it changed:

[repair] <feeder>: <repair name>: <file> line <n>: <statement before> -> <statement after>

Phase 7b writes smartds_repairs.csv in every circuit folder, with the columns feeder, repair, file, line, was and now and one row per changed statement. file names Master.dss, or for regulator_settings_from_voltage the file of the statement, Transformers.dss or Regulators.dss as the feeder folder writes it, and line the statement's first line. It holds a header and no rows when nothing was repaired or the repairs are off.

Phase pre stops with a [FAIL] line that names the feeder and says what contradicts what when a feeder has a defect without a repair. The repairs apply with load growth on and off. With growth on, phase growth reads each feeder with its repairs applied in memory, so the growth plan holds the repaired basekV; the staged files are never written.

smartds_repairs: true in pipeline_config.yaml turns the repairs on. A caller turns them off with smartds_repairs: false in the pipeline_config.yaml of its --settings folder. Phase pre then prints one line and reads no feeder file, Phase 7b writes tables with a header only, and every feeder runs as released.

Phase 8 rates a head on a regulator by the kVA of the regulator's first winding and keeps the head columns of a line head (see docs/outputs.md).

Peak-day rules

peak_day_rule in pipeline_config.yaml sets the calendar day that each circuit is simulated on. Under per_circuit and per_group, baseline circuits run on each feeder's baseline seasonal peak day and the rule sets the day of each mixed or stress circuit.

  • per_circuit, the default: all heating groups of a circuit run on one day, the seasonal peak day of the circuit's building load under its mix. Phase mix_days finds that day and writes <ws>/mix_days/<ST>_circuit_days.csv, <ST>_circuit_labels.csv and <ST>_circuit_weights.csv. For each mix that is not 100 % baseline, it also writes the subtree <ws>/mix_days/<mix>/ with the 5b, 5c, 6 and 7a outputs for that day. With load growth on, the day is the peak day of the grown curve and the subtree of every mix is written (see "Load growth over planning years").

  • per_group: each heating group (baseline, dm, uncontrolled) runs on its own seasonal peak day. Phase mix_days writes nothing.

  • given: the caller names the day of every circuit. In this example the caller runs both feeders of a substation of NC_GSO_urban__NC, uhs13_1247--udt4015 and uhs13_1247--udt4819, on 15 July.

    1. The settings folder my_settings/ holds pipeline_config.yaml with peak_day_rule: given and given_days.csv with the columns Feeder, Season, Month and Day. Each row gives one feeder, named as its SMART-DS feeder folder (as in <ST>_peak_days.csv), one season, and a month and day without a year. Here the rows are uhs13_1247--udt4015,summer,7,15 and uhs13_1247--udt4819,summer,7,15.
    2. python run_case.py --case configs/cases/NC_GSO_urban__NC.yaml --all --season summer --settings my_settings checks the file before any phase runs.
    3. Phase mix_days takes the given day for every mix, 100 % baseline mixes included, and cuts the profiles of every heating group on it. <ws>/mix_days/<ST>_circuit_days.csv records the day with the largest value of the mix's feeder curve on it as Peak_kW.
    4. Phases 7b and 7c read the day and the profiles of every circuit from <ws>/mix_days/<mix>/. PV follows the day.
    5. run_case.py prints the rows. <run_dir>/resolved_case.yaml lists them in its settings block, and <run_dir>/settings/ holds a copy of given_days.csv.
  • per_substation: every circuit of the case runs on one day per mix and season, the peak day of the sum of the building load of the case's circuits under that mix (the grown curves with load growth on). All circuits of the substation then share one window, so the step-by-step sum of their head power in substation_limits.csv adds the same dates. Phase mix_days cuts every mix on that day, 100 % baseline mixes included, as under given, and the baseline check does not run. Peak_kW of a feeder's row in <ws>/mix_days/<ST>_circuit_days.csv is that feeder's own peak on the day.

    run_case.py stops with [FAIL] when the rule is given without --settings or without given_days.csv in the folder, when the folder holds given_days.csv under another rule, and on a wrong header, no data row, an empty feeder, a season other than summer or winter, a month or day that is not a whole number, a month and day that are not a date of a 365-day year (29 February stops), a month outside the season (6 to 8 for summer, 12, 1 and 2 for winter) or a feeder and season given twice; phase mix_days stops when a feeder of the case has no row for the run's season.

To switch, set peak_day_rule to per_circuit, per_group, given or per_substation before the run. run_case.py stops on any other value. PV follows the day the circuit runs on.

The multi-day window

horizon_days in pipeline_config.yaml sets how many days each circuit is simulated on. OpenDSS solves them as one continuous run of 96 x horizon_days steps. The documented values are 1, 7 and 14, and the default is 7. With horizon_days: 1 a run is the one-day run on the peak day and every output is as before.

  • The window holds horizon_days consecutive days around the simulated peak day, day X, with day X at position ceil(horizon_days / 2): X-3 to X+3 for 7 days, X-6 to X+7 for 14 days.
  • The window stays inside the season and inside one stretch of the data year: summer 1 June to 31 August; winter 1 January to 28 February, or 1 to 31 December. A window that would leave its stretch is shifted back into it, so it never crosses 31 December. The season months are those of Phase 5b (WINTER_MONTHS and SUMMER_MONTHS in find_max_day_curve_impl.py).
  • Day X is picked as before, under every value of peak_day_rule. Under given the caller's day is day X. Under per_group each heating group has its own window around its own day X, and the circuit's window, PV and day types follow the baseline group.
  • The dates are those of 2018, the calendar of the building curves, so each window day is a weekday or a weekend day. A federal holiday keeps the day type of its weekday. Day X always runs as in the one-day run, with weekday sessions, whatever its date.
  • run_case.py stops with [FAIL] on a value that is not a whole number of days, 1 or above. A window longer than its stretch stops with [FAIL] in Phase 5b.

ASSUMPTION: the multi-day window is 7 days, three days either side of the simulated peak day, kept inside the season. It covers Winter Storm Elliott (21 to 26 December 2022, 6 days, with load shed in the Carolinas) and the average recent heat wave in large U.S. cities (about 4 days) with lead-in days; Winter Storm Uri in Texas lasted 13 days (8 to 20 February 2021), so horizon_days 14 is the longer option, and a shorter window gives batteries fewer days to run down. The building curves use typical-year and 2018 weather, so the window holds no historical storm. Sources: the FERC, NERC and Regional Entity report on Winter Storm Uri, https://www.ferc.gov/media/february-2021-cold-weather-outages-texas-and-south-central-united-states-ferc-nerc-and; the FERC, NERC and Regional Entity inquiry into Winter Storm Elliott, https://www.ferc.gov/sites/default/files/2023-11/24_Winter-Storm_Elliot_1107_1300.pdf; EPA Climate Change Indicators: Heat Waves, web update June 2024, in the EPA website snapshot of 19 January 2025, https://19january2025snapshot.epa.gov/climate-indicators/climate-change-indicators-heat-waves.

What each phase does with a window:

  1. Phase 5b, and phase mix_days for each mix, cut every building profile on each window day as they cut day X, and join the days in date order.
  2. Phases 5c, 6 and 7b carry 96 x horizon_days values per loadshape. Phase 6 takes the kvar to kW ratio of each step from its own timestamp.
  3. In Phase 7c each PV array takes each day's shape from that day's own month and day of the solar file. The EV cars charge day after day (see "EV cars"), the controlled cars are placed on each day (see "EV control"), and the batteries carry their energy from one day to the next (see "PV and storage"). Under pv_rule_<segment>: peak_ratio a host's peak is that of day X, so the window changes no size.
  4. Each circuit folder gets window_days.csv: one row per window day with its date, weekday, day type, day index, a flag on day X and the holiday name, if any. The per-step tables get date, day_index and day_type. Phase 8 adds the same columns to aggregate_m1.csv and aggregate_m2.csv and writes the steps of day X as day_x_first_step and day_x_last_step in circuit_summary.csv and in the summary rows (see docs/outputs.md).

A caller that wants the one-day run sets horizon_days: 1 in the pipeline_config.yaml of its --settings folder.

Heating labels and EV hosts

Phase 7b and phase mix_days deal the heating groups (baseline, dm, uncontrolled) of each feeder and mix with 7_circuit_instantiation/heating_split.py. heating_label_unit in pipeline_config.yaml sets what is counted:

  • building, the default: each building profile (yearly loadshape) of the feeder gets one group, the group counts are exact over buildings by largest remainder, and every customer of a building runs in its group.
  • customer: the counts are over customers (load names), and a building shared by several customers takes the group of the last one dealt.

Phase 7b and phase mix_days stop on any other value. Every load runs on a building profile: Phase 7b stops with [FAIL] and the loadshape name when a loadshape has no kW or kvar CSV, and missing_files_report.json stays empty.

SMART-DS writes a customer on a 120/240 V service as two Load lines, <customer>_1 and <customer>_2, one on each 120 V leg, for example load_p1ulv10415_1 and load_p1ulv10415_2 in https://oedi-data-lake.s3.amazonaws.com/SMART-DS/v1.0/2018/GSO/urban-suburban/scenarios/base_timeseries/opendss/uhs13_1247/uhs13_1247--udt4819/Loads.dss. Phase 7b splits each customer's building curve over its Load lines: each line takes as kW its share of the customer's SMART-DS kW (the line's kW in the feeder's Loads.dss over the sum over the customer's lines) and as kvar its share of the customer's SMART-DS kvar (heating_split.line_shares). A customer on two 120 V legs draws its building once, half on each leg, and a one-line load takes its whole building curve. A customer whose kvar sum is 0 takes its kW shares as kvar shares; a customer whose kW sum is 0 stops Phase 7b with [FAIL]. Phase 7b prints the count of customers by number of lines per circuit.

Phase 7b classes each load as residential when every loadshape of the load starts res_, commercial when every one starts com_, and prints the counts per circuit. EV hosts are drawn among the residential loads only, so ev_perc of a mix is the share of homes with an EV.

EV cars

The Phase 7 deploy builds one car per EV host, with its own uncontrolled row of kW over the 96 intervals of the day (7_circuit_instantiation/deployer_modules/ev_cars.py). ev_cars in pipeline_config.yaml sets where each car comes from. Main runs use the defaults, ev_cars: evwatts_sessions and ev_home_window: true.

  • evwatts_sessions, the default: each car draws one measured weekday home Level 2 charging session of EV WATTS, from chargers in the donor state's census division. The car plugs in at the session's start, stays plugged in until its end and charges the session's energy.
  • nhts_days: each car draws one 2017 NHTS weekday vehicle-day of the donor state, weighted by the household weight. A car that drove arrives home at its last arrival and leaves at its first departure; it charges the miles it drove times 33.7 / 99.9 kWh per mile. A car that did not drive does not charge. A vehicle-day with a driver trip faster than nhts_max_trip_speed_mph of ev_inputs.yaml (85 mph, the highest posted US speed limit) is class iv and is never drawn.
  • session_rows: the repaired 2024 generator, kept as a check. Each charging car charges the daily energy of the Team-Nando weekday Level 2 median curve as one block, started where the fleet is furthest below that curve.

ev_lvl2_perc of the mix is the share of a group's cars with a Level 2 charger (7.2 kW); the rest charge at Level 1 (1 kW). Under evwatts_sessions a Level 2 car charges at its session's mean power. Under evwatts_sessions and session_rows, the share of cars that charge on the day is measured from the EV WATTS extract every run; the other cars do not charge. Every draw is seeded from the mix's ev_seed, the feeder and the draw's name, so the baseline, mixed and stress circuits of one feeder share their draws and a rerun repeats them.

ev_work_share_case picks the share of the charging cars that charge at a workplace instead of at home: low 0, moderate 0.10 (the default) and high 0.20, the work_share menu of ev_inputs.yaml (from EVI-Pro Lite and the INL charging study). Each car charges at one place on the simulated weekday. One car goes through these stages:

  1. It charges today: it drew an EV WATTS session under evwatts_sessions, or an NHTS vehicle-day that drove under nhts_days.
  2. It is one of the floor(share x charging cars + 0.5) cars of its group drawn for work, with the draw work_<group>.
  3. It draws an office: one of the circuit's commercial loads, at random with replacement (office_<group>), so several cars can share one office.
  4. Under evwatts_sessions it draws one Business Office Level 2 weekday session of the office extract, from chargers in the donor state's census division: it plugs in at the session's start for the session's duration and charges the session's energy at its mean power. Under nhts_days it draws one weekday vehicle-day with a stop at work: its window is the time parked at work, in pieces when it leaves and returns, and it charges the miles it drove times kWh per mile at 7.2 kW.
  5. Its two EV loads sit on the office's buses (EVu_w<i>_<office>_1 and _2, or EVc_w<j>_), and nothing is charged at its home.
  6. A controlled work car keeps its charging inside its window at work, and under valley_fill_transformer it fills the service transformer of its office.
  7. Its row in <circuit>/EVControl/ev_places.csv records its home host and its office, with the bus and coordinates of each.

Under session_rows every car charges at home: the work share is not applied. A circuit without a commercial load keeps every car at home. The deploy prints the case, the share, the commercial loads and the work cars per group.

ev_home_window: true keeps the charging of each controlled car inside the intervals it is plugged in at home or at work: its EV WATTS session, its NHTS vehicle-day, or under session_rows a drawn NHTS vehicle-day. Energy that does not fit is left over. With false, controlled cars may charge in any interval of the day.

ev_day picks the value set of every input in ev_inputs.yaml. Main runs use the default, ev_day: typical. stress changes behaviour, never hardware:

  • every car charges under evwatts_sessions and session_rows, and the NHTS pool keeps only vehicle-days that drove from and to home (class i): the cars of nhts_days and the windows of the controlled cars of session_rows;
  • the EV WATTS and NHTS pools keep only the months of the simulated season: June, July and August for summer, December, January and February for winter (the meteorological seasons);
  • session_rows uses the 75th percentile check curve;
  • the valley rules plan on the day-ahead forecast error;
  • offpeak_start cars spread their starts with a standard deviation of 15 minutes instead of 60.

The seeds and draw names are the same under both values, so a stress run differs from a typical run only by the values. The deploy prints the size of each draw pool.

Over a window of more than one day (horizon_days above 1) the cars charge day after day. The cars of day X stay those of the one-day run. One car goes through these stages:

  1. It keeps its charger and its drawn weekday session or vehicle-day for every weekday of the window. Under evwatts_sessions and nhts_days it also draws one weekend session or vehicle-day, from the weekend extracts (build_evwatts_extract.py --day-type weekend, build_nhts_extract.py --day-type weekend), and keeps it for every Saturday and Sunday. session_rows has one curve and uses it on every day.
  2. On day X it charges or not as in the one-day run. On every other day, under evwatts_sessions and session_rows, a seeded draw with the measured share of that day's type decides whether it charges. The weekend share is measured on the weekend extract with the formula of the weekday share. Under ev_day: stress every car charges on every day. Under nhts_days a car charges on every day whose vehicle-day drove.
  3. Its plug-in window runs on the window's own timeline: charging past midnight lands on the next day. The first day of the window receives the part after midnight of the session of the day before it, which is drawn as any other day. A window ends when the car plugs in again.
  4. Energy that does not fit inside its plug-in window on a charging day is charged on the next evening without a drawn session, from its own plug-in time, at its own power, inside its own window. Energy still owed when the window ends is reported and not charged.
  5. A work car charges at its office on weekdays and at home, with its weekend session, on weekend days. For this it has two more EV loads at home, EVu_<host>_1 and _2 (or EVc_), with the shape EVu_<i>h. Work cars are the work cars of day X, plus the work share of the cars that do not charge on day X, so the work share holds on every weekday.
  6. <circuit>/EVControl/ev_car_days.csv records each car and day: whether it charges, the session, the place, and the energy needed, delivered, topped up and owed.

ASSUMPTION: over a horizon of more than one day each car keeps its one drawn session and charger, and on every day other than the simulated peak day it charges with probability equal to the measured share of days of that type with a session at home chargers of its census division (for example 0.403 South Atlantic and 0.454 West South Central on weekdays, 0.384 and 0.435 on Saturdays and Sundays), drawn independently each day. Real drivers keep habits such as fixed charging days, so drawn days spread more evenly than real ones, while the expected sessions per car and the fleet energy per day equal the measured values.

ASSUMPTION: energy a car cannot charge inside its plug-in window on a charging day is charged on the next evening the car has no drawn session, from its own plug-in time, at its own power, inside its own window; energy still owed when the horizon ends is reported and not charged. A Level 1 car at 1.0 kW needs 10 h for a 10 kWh session, so without this rule it would receive less energy over the horizon than its sessions record; when every car charges every day (stress) no top-up occurs.

ASSUMPTION: workplace charging happens on weekdays only. EV WATTS Business Office Level 2 chargers record a session on 11 to 14 percent of Saturdays and Sundays in service against 30 to 32 percent of weekdays, and a weekend charger-day takes about a third of a weekday's energy (weekend_files in ev_inputs.yaml, EV WATTS, https://doi.org/10.15483/1970735).

A worked example of the top-up, from the 2017 NHTS vehicle-day of household 30022175, vehicle 1, in NC: a Level 1 car at 1.0 kW is plugged in from 18:30 to 07:00, 50 intervals, and needs 15.25 kWh a day (45.2 miles at 33.7 / 99.9 kWh per mile). Each charging night 12.50 kWh fit and 2.75 kWh are left over. With charging days 1, 4, 5 and 6 of a 7-day window, the car tops up 2.75 kWh on day 2 and the 8.25 kWh of days 4, 5 and 6 on day 7. Its windows then hold 61.0 kWh, against 50.0 kWh if the leftovers were dropped. The day 7 top-up starts at 18:30, so the 2.75 kWh that fall after the window's last midnight are reported as owed. When every car charges every day (stress) the car has no free evening and nothing is topped up.

The inputs and their sources are in 7_circuit_instantiation/data_ev_cars/ev_inputs.yaml. The deploy writes one row per car to <circuit>/EVControl/ev_cars.csv (see docs/outputs.md).

EV control

ev_control in pipeline_config.yaml sets how the Phase 7 deploy shapes the charging of controlled EVs. Every circuit has uncontrolled and controlled cars, and each controlled car starts from its own uncontrolled row (see "EV cars"). Main runs use the defaults, ev_control: valley_fill_feeder and ev_valley_base: buildings_only.

  • uncontrolled: controlled cars keep their session rows.
  • valley_fill_feeder, the default: the deploy solves the circuit without EVs, adds every uncontrolled car's kW to the feeder-head load, and places each controlled car, in order of plug-in time, on the intervals where the forecast of that load is lowest. A car keeps its daily energy and its number of charging intervals.
  • valley_fill_transformer: the same, on the load of each car's own service transformer, plus the uncontrolled cars on it. A car whose host has no single service transformer uses the feeder-head load.
  • water_fill_feeder: the same base, order and forecast as valley_fill_feeder, but each car's power varies from 0 up to its power in each interval of its window, filling the lowest intervals toward one level, the valley-filling schedule of Gan, Topcu and Low (2013), https://doi.org/10.1109/TPWRS.2012.2210288.
  • offpeak_start: each controlled car whose plug-in window holds an interval of the cheap period of the donor state's time-of-use rate has a schedule time: the start of the cheap period it meets, moved by a normal draw with a standard deviation of start_spread_min (60 minutes typical, 15 stress), rounded to whole intervals. The car starts at the later of its schedule time and its plug-in, capped at the end of its window, so a car plugged in after its schedule time starts at once. It charges at its own power until its daily energy is delivered or the window ends. A car whose window holds no cheap interval keeps its plug-in start. A car without a window takes its first charging interval as its plug-in and wraps over midnight. The rate is the weekday schedule of the simulated day's month, because the cars draw weekdays.

The valley rules (valley_fill_feeder, valley_fill_transformer, water_fill_feeder) place controlled cars in order of plug-in time, the day running from 04:00 as the NHTS travel day. Cars that do not charge, or drew a day without driving, come last; ties keep host order. The order holds under ev_home_window: false too.

The valley rules plan on a forecast of each curve they fill, not the curve itself, because an aggregator does not know the day's load in advance. For a curve with mean load W (kW), the relative error CV(W) comes from Sevlian and Rajagopal, https://arxiv.org/abs/1404.0058v3: the one-hour-ahead model on a typical day and the day-ahead model on a stress day. The error is normal, one draw per hour for each curve, seeded like the cars. Each placed car joins the forecast, because the aggregator knows its own cars. OpenDSS still solves the true loads. A curve with W <= 0 gets no error.

The valley rules and offpeak_start keep each car inside its window when ev_home_window is true. The service transformer map leaves out lines switched out with enabled=n, as OpenDSS does when it solves.

ev_valley_base sets what the no-EV solve of the valley rules holds: buildings_only (the default) or after_pv (also PV). It never holds storage, except under storage_order: before_cars (see "PV and storage"), when it holds PV and storage. The feeder and transformer rules compare a feeder view with a local view of where charging lands.

ev_valley_day sets the curve the controlled cars see on each day of a window of more than one day. Both values give the one-day run at horizon_days: 1.

  • own_day, the default: the no-EV solve covers the whole window, and each day's charging and top-up cars are placed, in order of plug-in time on the window's timeline, on that day's own forecast. Each day has its own forecast error: day X keeps the draw of the one-day run and every other day has a draw of its own. offpeak_start reads the tariff row of each day's month and day type, the weekday schedule on weekdays and the weekend schedule on Saturdays and Sundays.
  • peak_day: every day's cars are placed on day X's forecast, repeated on each day. offpeak_start reads the tariff row of day X's month and of each day's own day type.

The rates are dated copies of OpenEI U.S. Utility Rate Database records in 7_circuit_instantiation/data_tariffs/<ST>_urdb_rate.json, with their source URL. fetch_tou_rates.py chooses them from the queries in data_tariffs/rate_queries.yaml. Each file records whether its rate was current when it was fetched.

PV and storage

PV and storage go on two segments of loads: homes (every yearly loadshape of the load starts res_) and commercial loads (every one starts com_). Each segment has its own switches in der_sizing (pv_residential, pv_commercial, storage_residential, storage_commercial, all true) and its own shares in each mix (pv_res_perc, pv_com_perc, storage_res_perc, storage_com_perc). A mix without one of these keys, or without ev_lvl2_perc, stops Phase 7b. Phase 7b draws round(share x loads of the segment) hosts, at least one when the share is above 0 and the segment has loads, with the mix's pv_seed and storage_seed. storage_hosts sets where the batteries go: with_pv (the default) draws them among the segment's PV hosts first, independent among all its loads, apart among its loads without PV.

At a host with two legs (<host>_1 and <host>_2), home or commercial, each PV array and battery is split into two equal halves, one on each leg's bus, where the EV legs go. A load without legs takes one unit on its own bus.

PV size (DC) under pv_rule_<segment>: roof_and_use (the default) is the lesser of roof coverage x roof area x module kW per m2 and the annual use share x the building's baseline annual electricity use / the annual yield of the donor's SMART-DS solar file. roof_area_source: floor_stories (the default) takes floor area over stories, tilted 20 degrees for homes as LBNL does for its coverage shares; metadata takes the building model's own roof column. The commercial coverage_rule_commercial: comstock uses the ComStock rule (40 % of the metadata roof at 0.21 kW per m2) instead of the LBNL coverage share. The inverter is Pmpp / inverter loading ratio. Storage kW is a ratio of the host's PV kW (1.0 for homes and commercial arrays up to 100 kW, 0.5 above), also at a storage host without PV, and kWh is a duration times kW. sizing_case (low, moderate, high) picks each parameter's entry; low gives the smaller systems. pv_rule_<segment>: peak_ratio keeps the earlier rule on the host's peak kW. With load growth on, that peak takes the factor the host's annual use takes under der_resize_with_growth, apart from a customer of load_factors with peak_factor, whose own loadshape carries its growth (see "Load growth over planning years"). The sources of every value are in the comments of der_sizing.

storage_rule sets how the batteries run. schedule (the default) writes no controller: each host's batteries follow a daily plan computed in Python on the forecast of their view's curve, in five stages.

  1. The plan uses the forecast of the view's curve for the day, with the forecast error of the EV valley rules and its own draw forecast_storage_<view>.
  2. For a starting energy s and a discharge budget x (kWh delivered to the grid), the battery discharges above the level that holds x within its kW (peak shaving) and charges below the level that refills x / (discharge efficiency x charge efficiency) within its kW (valley filling, Gan, Topcu and Low 2013, https://doi.org/10.1109/TPWRS.2012.2210288). Both levels are solved exactly on the piecewise-linear curve.
  3. x is the largest budget, found by bisection, for which the stored energy stays between storage_reserve_pct and full at every step and ends the day at s.
  4. Under schedule_start: best (the default), stages 2 and 3 run for every s from storage_reserve_pct to full in steps of schedule_start_step_pct (10 %), and the plan that leaves the lowest forecast maximum of the view is kept; a tie goes to the larger x, then to the lower s. Under fixed, s is storage_start_pct.
  5. The host's plan joins the curve and the next host plans on it. OpenDSS follows each plan (DispMode=FOLLOW), each battery starting at s (%stored).

Over a window of more than one day each host's plan is one loadshape of 96 x horizon_days points, and each day is planned in turn:

  1. The day is planned on its own forecast, with its own forecast error, from the energy the day before left. The first day starts at s.
  2. The battery discharges above the level that holds the discharge budget x, and charges below a level that is never above the discharge level, with the grid energy that brings the stored energy back to s at the end of the day.
  3. x is the largest budget for which the stored energy stays between storage_reserve_pct and full at every step of the day. A day whose valleys cannot hold the charge ends below s; the next day starts there and aims at s again.
  4. s comes from schedule_start: best (the default) takes the s of the one-day rule on day X's forecast; best_window runs every s through the whole window and keeps the one that leaves the lowest forecast maximum of the window, with the ties of best; fixed is storage_start_pct. At horizon_days: 1 best and best_window give the same plan.
  5. StorageControl/storage_midnights.csv records, per battery and day, the planned and the monitored stored energy at midnight.

Under simple and tuned the controller keeps one pair of targets for the whole window, set on the window's forecast, and the batteries carry their energy through the continuous solve.

simple and tuned write one OpenDSS StorageController per view, discharging above kWTarget (PeakShave) and charging below kWTargetLow (PeakShaveLow). simple sets them from the view's daily peak and mean (simple_peak_fraction, simple_mean_fraction); tuned at the level above which the curve holds the batteries' usable energy and the level below which filling the curve recharges them. Under these rules every battery starts at storage_start_pct, and the targets use the same forecast of the measured curve.

  • storage_view: feeder (the default, the feeder-head line), transformer (each host's service transformer) or building (the line that feeds the host's bus).
  • storage_order: after_cars (the default; storage watches the curve with the cars placed), before_cars (storage watches the curve without cars, and the cars' base solve holds the storage) or same_measurement (each without the other).
  • storage_measure: all_placed (the default; buildings, PV and, under after_cars, cars) or buildings_only.
  • storage_layer: add_kw (the default; a buildings-only solve plus the kW of the layers on the view) or solve (an OpenDSS solve with the layers in).

Every battery draws standby power. Under storage_standby_element: load (the default), Storage.dss gives each Storage element %IdlingkW=0 and writes after it a constant-power Load standby_<battery> on the battery's bus that draws the standby kW at every step (status=fixed). Under idling, the standby is the OpenDSS %IdlingkW of each Storage element. storage_standby_case (low, moderate, the default, or high) picks the entry. A home battery draws storage_standby_w (2, 12 or 71 W), the lowest, median and highest standby power measured with the battery discharged on 26 residential systems by Orth et al. (2023), https://doi.org/10.1016/j.est.2023.107299, as a percent of the host's storage kW. A commercial battery draws storage_standby_pct_of_kw of its kW (0.04, 0.24 or 1.42 %).

Load growth over planning years

A run simulates the circuits as SMART-DS built them, with the building load of the data year. Load growth moves a run to one planning year, growth_years years after the data year. Existing customers use more or less electricity. New homes and businesses arrive as copies of the circuit's own customers, one at a time or as whole copied laterals. Named loads, such as a hospital, can be added. The run also reports the planning limits of the grown circuit. Network growth then builds what those limits call for (see "Network growth").

Every setting sits in configs/growth.yaml. The tracked file has growth_years: 0, which is growth off: phase growth prints one line, no growth output is written, and every output equals a run without the file. A caller turns growth on with a growth.yaml in its --settings folder (see "Settings from a caller"). That file holds only the keys it changes. Every key path must exist in the tracked file, except under infill_share_metro and block_attach_buses, which take new keys. A list replaces the tracked list. run_case.py checks every key before any phase and stops with one [FAIL] line that names the key, the value and the accepted values.

# my_settings/growth.yaml: year 10, new homes split between infill and blocks by the metro share
growth_years: 10
infill_share: metro

One run is one planning year in one workspace. A study of several years runs each year in its own workspace.

Keys

Key Values Meaning
growth_years whole number, 0 or above; default 0 Years after the data year. 0 is growth off
case low, moderate, high; default moderate The AEO2026 case that gives all four rates: Low Economic Growth, Counterfactual Baseline, High Economic Growth
rate_cases percent a year per rate and case households, use_per_household, floorspace, use_per_ft2
rates null or a number per rate A number replaces that rate of the case
infill_share 1.0, metro, national or a number from 0 to 1; default 1.0 Share of the new homes built as infill; the rest arrive as blocks
infill_share_metro topology: number The share of each topology's metropolitan region, used by metro
infill_share_national number The share used by national
companions feeder, national, aeo; default feeder How many new businesses come with the new homes
companions_national two numbers Commercial buildings and households, in millions, for national
companion_excluded_types list of ComStock building types Types never copied as a companion
block_attach_buses feeder: list of buses Where blocks attach, used in order before any drawn bearing
named_loads list of {feeder, type, count, year, bus} Loads added by name; bus is optional
named_load_bus seeded, strongest, weakest; default seeded The bus of a named load without bus
named_load_mv_line_m metres; default 269.0 Length of the new line of a named load that connects at medium voltage, on a feeder with no medium-voltage customer
der_resize_with_growth true, false; default false false: the PV and storage of existing hosts keep the size of a run without growth. true: every host is sized on the use of the planning year
load_factors list of {feeder, load, factor, peak_factor} The factor of one named customer; peak_factor is optional
regulators.block_copies with_control, never; default with_control with_control: a lateral that holds a voltage regulator may be a block template, and its copy carries the regulator and its RegControl. never: such a lateral is never a template
regulators.path_impedance with_regulator, lines_only; default with_regulator with_regulator: each voltage regulator on the path adds its series reactance to the path impedance of named_load_bus. lines_only: the lines alone
planning_limits.voltage_band repository, range_a, range_b or [low, high]; default repository The band of the voltage limit, per unit
planning_limits.voltage_bands range_a, range_b The two ANSI C84.1 bands
planning_limits.line_limit_percent, head_limit_percent, transformer_limit_percent, substation_limit_percent percent; default 100 The loading limits
network_growth a map; default mode as_needed The keys of network growth (see "Network growth")

Rates and factors

The rates are the average annual changes from 2025 to 2050 of the U.S. EIA Annual Energy Outlook 2026, Table 4 (Residential Sector Key Indicators) and Table 5 (Commercial Sector Key Indicators), rounded to two decimals. The sources and the derivation of each rate are written beside the values in configs/growth.yaml. One case picks all four rates from the same AEO case.

  • A home is a customer whose yearly loadshapes all start res_. A business is one whose loadshapes all start com_. One ResStock sample is one dwelling unit (ResStock documentation, "One Row of Data Is Not One Real House", https://nrel.github.io/ResStock.github.io/docs/resources/explanations/One_Row_Data_House.html), so a home customer is one household and the household rate applies to the count of home customers.
  • The factor of every home is (1 + use_per_household / 100) ^ growth_years. The factor of every business is (1 + use_per_ft2 / 100) ^ growth_years. A customer that is neither keeps factor 1 and is never copied. A new customer takes the factor of its segment.
  • A factor multiplies the kW and kvar of each of the customer's Load lines. The loadshape CSVs stay unchanged, so energy and peak move together and the power factor is kept. Growth scales the building load only. EV, PV and storage inputs are never scaled.
  • load_factors replaces the factor of a named customer. With peak_factor the customer's curve is stretched: new = a x old + b, with a = (peak_factor x peak - factor x mean) / (peak - mean) and b = mean x (factor - a), peak and mean being the annual peak and the annual mean of the customer's kW. Annual energy then grows by factor and annual peak by peak_factor. The customer gets its own loadshape CSVs. The run stops with [FAIL] when a point of the year falls below 0, when peak equals mean, or when the feeder or the load is not in the case. For a curve with peak 900 kW, mean 650 kW and minimum 500 kW, factor: 1.10 and peak_factor: 1.30 give a = 1.82 and b = -468, so the three values become 1,170, 715 and 442 kW.

The ASSUMPTION labels of the rates are in configs/growth.yaml: each growth year applies the 2025 to 2050 average on top of the data year; the national rates stand for one circuit; data centre servers and EV charging are left out of the use rates; the rates are rounded.

How many new customers

Per circuit, with H its homes and N its businesses in the SMART-DS Loads.dss, g(r) = (1 + r / 100) ^ growth_years, and Python's round:

  • New homes = round(H x (g(households) - 1)).
  • Companion businesses: feeder = round(new homes x N / H); national = round(new homes / (households_million / commercial_buildings_million)); aeo = round(N x (g(floorspace) - 1)).
  • Infill homes = round(new homes x share); block homes = new homes - infill homes. The companions split the same way. metro takes the share of the run's topology_id in infill_share_metro and stops with [FAIL] when it has none.

Worked example, a circuit of 494 homes and 272 businesses at 10 years with the moderate case. g(households) = 1.0079 ^ 10 = 1.0819, so new homes = round(494 x 0.0819) = 40. Companions: feeder gives round(40 x 272 / 494) = 22; national gives round(40 / (127.6 / 5.9)) = 2; aeo gives round(272 x (1.0102 ^ 10 - 1)) = 29. With infill_share: metro and a share of 0.25, 10 homes are infill and 30 arrive in blocks; of 22 companions, 6 are infill and 16 go with the blocks. The factors are 0.9972 ^ 10 = 0.9724 for homes and 0.9935 ^ 10 = 0.9369 for businesses.

Counts are computed, never drawn. The seeds only choose which customer or lateral is copied and where it attaches. Each circuit has one growth seed, random_seed of pipeline_config.yaml plus the sha256 offset of <substation>|<feeder>, and every draw has its own name on that seed, so adding a draw never moves another. The draws of a named load carry its place in named_loads, so an entry inserted before others moves their draws. All mixes of a run share the same new customers.

Plans nest across planning years

The plan of a circuit is built year by year, from year 1 to growth_years, in one seeded sequence per circuit. The plan of horizon N is the state after year N. A longer horizon therefore holds every unit of a shorter one, with the same copied customer or lateral, the same buses and the same names. The counts at every horizon stay those of "How many new customers": with C(t) the counts at t years, year t adds what C(t) holds beyond what the earlier years added. Every unit records the year it arrives.

Inside year t the order is fixed:

  1. The year's infill homes take the next positions of the seeded home order.
  2. The year's infill companions are the next companions.
  3. The year's block homes and block companions wait for a block. While a lateral fits the waiting homes and companions, a block is drawn and built (see "Extension blocks").
  4. Once a block is built, the waiting companions are dealt to the built blocks, one after another round the blocks in build order.

At the end of the last year, the homes still waiting arrive as infill homes and the companions still waiting as infill companions. The tables mark them remainder and waiting. They are the only units that a longer horizon may place differently, because it may put them in a block.

Voltage regulators

A voltage regulator is a transformer with two or more windings whose windings all have the same kV. The SMART-DS release writes its regulators so, for example Transformer.trans_reg_creguladortension(r:p175udt21772-p175uhs2_1247) with buses=(...), kvs=(12.47, 12.47) and kvas=(10000.0, 10000.0) (https://oedi-data-lake.s3.amazonaws.com/SMART-DS/v0.9/2018/Full_Texas/P175U/scenarios/base_timeseries/opendss/p175uhs2_1247/p175uhs2_1247--p175udt21772/Transformers.dss), and the line regulators of network growth are regulators too. The growth code crosses a regulator like a line of its own phases:

  • A medium-voltage bus is the source bus or a bus reached over a line or over a regulator from a medium-voltage bus. Any other transformer ends the medium-voltage network.
  • A three-phase medium-voltage bus, where a block or a named load attaches, is fed by a three-phase line or by a three-phase regulator.
  • The tap of a lateral is the source bus or a bus fed by a three-phase line or by a three-phase regulator.
  • A path from the source bus crosses a regulator and adds no line and no length for it. A block beyond a regulator gets its path loading from the lines on both sides of it.
  • Under regulators.path_impedance: with_regulator, the path impedance that named_load_bus strongest and weakest and the column bus_impedance_ohm read adds, for each regulator on the path, the series reactance j x XHL / 100 x kV^2 x 1000 / kVA ohm, with kV and kVA of its first winding as written after the repairs. XHL is the percent reactance from winding 1 to winding 2 on the kVA base of winding 1, with kV phase to phase for a three-phase transformer and the winding kV otherwise (https://opendss.epri.com/Properties16.html); the conversion to ohm on that base is https://cimhub-opendss.readthedocs.io/en/latest/schema_ref/XHL/. XHL is the value of XHL or X12 of the statement, else the first value of XscArray, else 7, the OpenDSS default (https://cimhub-opendss.readthedocs.io/en/latest/schema_ref/Xhl/). A regulator written as in the release example above gives no XHL and takes 7 percent. A regulator without a kV or a kVA on its first winding gives no path impedance. ASSUMPTION: a regulator adds its leakage reactance only; its winding resistance is left out, which lowers the magnitude of the path impedance a little. Under lines_only a regulator adds nothing.
  • Under regulators.block_copies: with_control, a lateral that holds a regulator is a block template like any other. Its copy rewrites each bus of the regulator's buses= array, as it rewrites bus=, bus1= and bus2= values, and carries every RegControl whose transformer= names a transformer of the lateral: renamed <name>_g<unit>, with transformer= the copied regulator and any bus= on the new buses, every other property as the feeder writes it after the repairs. A regulator of the lateral that no RegControl names is copied alone, with one [growth] line. Under never such a lateral is never a template.

Infill

  • An infill home is a copy of one existing home of the same circuit. The infill homes take the positions of one seeded order of the circuit's homes, in the order they arrive. Its unit is h<position>.
  • The k-th companion of a circuit is a copy of one business. k counts the infill companions, the businesses of copied mixed laterals and the dealt companions in the order they arrive. The business is one seeded draw among the circuit's businesses with a known building, without the types of companion_excluded_types and without any whose floor area is above k x the circuit's mean floor area per business. A business that an earlier companion copied is left out while another is left. The bound grows with k, so no copy is larger than the companion count times the mean floor area, at every horizon. Its unit is c<k>. When no business fits, the companion is not placed and the summary counts it.
  • A copy copies its customer's connection. When the copied customer's service transformer serves more than one customer, the copy gets a new drop: a line from the bus where the copied customer's last line starts, with the same LineCode, phases and length, to a new load bus. When the copied customer is alone on its transformer, the copy gets its own copy of that transformer and of its secondary lines. A copy of a medium-voltage customer gets a copy of the line that feeds its bus, from the same upstream bus. A customer whose load bus is not the end of exactly one line is copied onto its own bus.
  • A copy has the Load lines of its customer: legs, kV, phases, model, kW and kvar shares, and loadshape.

Extension blocks

  • A block is a copy of one of the circuit's own laterals. A lateral is rooted at a medium-voltage bus fed by a line of fewer than three phases whose upstream bus is fed by a three-phase line or a three-phase regulator, or is the source bus. It holds everything downstream: medium-voltage lines, transformers, secondaries and customers. Laterals with homes only and mixed laterals are templates. Laterals with businesses only are never templates, and a lateral that holds a regulator is one only under regulators.block_copies: with_control (see "Voltage regulators").
  • Each block is a seeded draw among the laterals that fit. A lateral with homes only fits when its homes are no more than the waiting homes. A mixed lateral also needs no more businesses than the waiting companions, each of a type outside companion_excluded_types and with a floor area within the bound of the companion it becomes. Its businesses are the next companions. Blocks are numbered over the whole plan.
  • A dealt companion is the next companion, connected at its block's attach bus with its own copy of its transformer and secondary, or of its medium-voltage line. The j-th dealt companion of the circuit goes to block ((j - 1) mod B) + 1 in build order, B being the blocks built when it is dealt.
  • A block attaches at the next unused bus of block_attach_buses for its feeder. Otherwise it attaches at the outermost three-phase medium-voltage bus along a seeded bearing from the load centre that is at least r(new) + r(earlier) from every earlier attach bus. The load centre is the mean position of the circuit's customers. r of a lateral is the largest straight distance from its tap bus to any of its buses. Positions come from Buscoords.dss, projected to metres. When no bus qualifies the block is not built: its homes leave the waiting list and arrive in the same year as infill homes, marked remainder.

ASSUMPTION: a new customer or block has the line lengths, line codes and transformer ratings of the existing customer or lateral it copies, and its place is electrical: no street map is used. SMART-DS sized its lines and transformers with the Reference Network Model for peak planning loads (https://github.com/openEDI/documentation/tree/main/SMART-DS). A new district with longer runs has lower voltages than its copy shows.

Named loads

  • named_loads adds count loads of ComStock type on feeder, present when year is at or below growth_years. The building is a seeded draw among the buildings of that type in the state's Phase 4 commercial selection. When the selection has none, it is a seeded draw among the buildings of that type in the state's Phase 1 ComStock metadata whose climate zone is the most common zone among the circuit's own businesses. That building is added to the Phase 5a download with the same upgrades as every other. The run stops with [FAIL] when the state has no such building.
  • The bus is the entry's bus, which must be a three-phase medium-voltage bus of the feeder. Without it, named_load_bus sets the bus: seeded is a seeded draw among the three-phase medium-voltage buses, strongest the one with the lowest positive-sequence impedance to the source bus along its path, weakest the highest. The voltage regulators on the path count by regulators.path_impedance (see "Voltage regulators").
  • The connection copies the existing business of the feeder whose SMART-DS kW is closest to the new load's annual peak kW. A medium-voltage template gives the new load a copy of its line from the chosen bus. A template behind a service transformer gives it a transformer and a copy of the template's secondary: the transformer has the smallest rating among the feeder's transformers of the template's phases and voltages that is at or above the new load's peak kVA.
  • When no such transformer is large enough, the load connects at medium voltage: one new three-phase line from the chosen bus to a new bus of its own, and one three-phase wye Load line at the circuit's base kV on that bus, with the whole customer's kW and kvar. The new line takes, among the LineCodes of the feeder's three-phase medium-voltage overhead lines longer than 1 m, the one with the smallest normamps at or above the load's peak current (peak kVA / (sqrt(3) x base kV)). When none carries the load it takes the largest, and the table says so. A feeder without an overhead code chooses among all its three-phase medium-voltage codes. The length is the median length of the lines that feed the feeder's own medium-voltage customers, or named_load_mv_line_m on a feeder without one. ASSUMPTION: the new line is overhead and takes the smallest code that carries the load, as the SMART-DS Greensboro feeders serve their medium-voltage customers; the default length is the median of the lines that feed the medium-voltage customers of two SMART-DS Greensboro feeders (NREL, SMART-DS Synthetic Electrical Network Data OpenDSS Models for SFO, GSO, and AUS, Open Energy Data Initiative, https://data.openei.org/submissions/2981). A longer line lowers the voltage at the new load.
  • A building that no load of the feeder uses has no SMART-DS load and so no reactive power series. It draws reactive power at the constant ratio of kvar to kW of its template's SMART-DS Load lines, at every step (an ASSUMPTION, labelled in configs/growth.yaml). Its loadshape is named com_kw_g<bldg_id>_pu.

Day X and the mixes

  • With growth on and peak_day_rule: per_circuit, day X of each circuit and season is the peak day of the grown curve: the sum of the grown curves of all its customers, existing and new. Every mix, the 100 % baseline mix included, is cut on day X by phase mix_days, and the baseline check does not run. given is unchanged. per_group keeps its group days.
  • Existing customers keep exactly the heating labels and the EV, PV and storage hosts of a growth-off run of the same mix. New loads never enter an existing shuffle. They get the same mix percentages in separate draws over the new loads only, with no minimum of one. A copy runs in the heating group of its building. A building new to the feeder is labelled in a separate draw.
  • PV and storage sizes follow der_resize_with_growth. Under the default, false, an existing host is sized on its building's annual use without its growth factor, so it has the size of a run without growth. Under true every host is sized on the use of the planning year, annual use x the host's factor. A host among the new customers is sized on its own grown use in both cases. Under pv_rule_<segment>: peak_ratio the host's day X peak takes the same factor as its annual use: an existing host keeps the peak of a run without growth under false, and is sized on its grown peak under true; a new host is sized on its grown peak in both cases. A customer of load_factors with peak_factor points at a loadshape of its own that carries its growth, so under peak_ratio it is sized on the day X peak of the loadshape it was stretched from under false, and on the day X peak of its own loadshape under true, with no further factor. The roof limit is unchanged. ASSUMPTION: a system installed before the planning year keeps its size while its building's use changes; true fits a study where all systems are bought in the planning year.

Planning limits

With growth on, the Phase 7 deploy reports the planning limits of the grown circuit after every solve. Under network_growth.mode: "off" nothing is built, replaced or moved.

  • Loading. For every line, the peak current over all steps against the normamps of its LineCode. For every transformer, the peak kVA against its kVA. Lines of 1 m or less are switches, fuses and reclosers; they are listed with a flag and left out of the line limit.
  • voltage_band: customers with any step below the low value or above the high value. EV legs are left out. repository is voltage_band of pipeline_config.yaml. range_a is 0.95 to 1.05 and range_b is 0.9167 to 1.0583, the ANSI C84.1 service voltages of 114 to 126 V and 110 to 127 V on a 120 V base (USDA Rural Utilities Service Bulletin 1724D-113, Table 1, https://rd.usda.gov/sites/default/files/UEP_Bulletin_1724D-113.pdf; Bulletin 1724D-114, Table 2, https://www.rd.usda.gov/files/UEP_Bulletin_1724D-114.pdf; Pacific Power, Power Quality Standards 1C.2.1, Table 1, https://www.pacificpower.net/content/dam/pcorp/documents/en/pp-rmp/power-quality-standards/1C_2_1_PF.pdf). The setting never changes the existing voltage summaries.
  • line_limit_percent and transformer_limit_percent: 100 percent of the rating (Abraham and Ghosh, DISCO slides, NREL/PR-6A40-89565, slides 13 to 15, https://nrel.gov/docs/fy24osti/89565.pdf). A second sourced value for lines is 75 percent of the thermal rating as the planning rating of conductors (City of Riverside Public Utilities, Distribution Design Manual, DDM-1 Feeder Systems, section 1.2 J, https://www.tellusventure.com/downloads/riverside/DDM-1%20Feeder%20Systems%20.pdf).
  • head_limit_percent: the head is tested by two measures. The row head is the peak kVA of each head against its own rating, rating_kva of heads.csv. With one head that rating is feeder_head_kva, the value of Phase 8; with several heads feeder_head_kva is the sum of their ratings. The row head_phase is the largest phase current of the head line over all steps against the normamps of its LineCode. heads.csv lists both for every head. A head on a regulator is rated by the kVA of the regulator's first winding, and its normamps is that kVA / (sqrt(3) x the kV of its first winding) for three phases; its phase currents leave out the neutral conductor.
  • substation_limit_percent: the head power of the case's circuits for one mix, summed step by step, against the substation rating. The rating is the sum of the kVA of the transformers in the topology's substation folder, the folder that holds the feeder folders. ASSUMPTION: the feeder head and the substation transformer take the same 100 percent of their rating as lines and service transformers; a utility that keeps a reserve for switching sets a lower value, and more circuits are then over their limit.
  • Each block gets the line distance from the source bus to its attach bus, the lowest voltage at its customers, the highest loading on the lines from the source bus to its attach bus, and whether either is outside its limit.

Phase and outputs

Phase growth sits between phases 4 and 5a (growth_plan.py). With growth on it writes, under <ws>/growth/, the plan growth_plan.json and the tables growth_customers.csv, growth_blocks.csv, growth_named_loads.csv, growth_factors.csv and growth_summary.csv. A building new to a feeder is added to the lists that Phases 5a onward read, with a load count of 0, so every curve that weights buildings by that count keeps its values.

Phase 7b appends the new customers and their lines and transformers to the copied feeder files of each circuit folder, and the RegControls of a block copied from a lateral that holds a regulator to the file of the feeder's first New RegControl statement; a feeder without one stops with [FAIL]. The existing lines of those files stay as they are, apart from the kW and kvar of the Load lines. scenario_assignments.json lists the hosts among the new loads under the key growth, apart from the existing hosts. Phase 7c writes loading_lines.csv, loading_transformers.csv, heads.csv, planning_limits.csv and growth_blocks.csv into each ModifiedCircuitData/. Phase 8 adds growth_years and the planning-limit columns to circuit_summary.csv and to the summary rows, and writes substation_limits.csv. docs/outputs.md lists every file and column.

A caller that overrides phase_order in defaults.yaml adds growth after 4. With growth on, a later phase stops with [FAIL] when the plan is missing or belongs to other growth settings.

Network growth

Load growth grows the load of a planning year. Network growth makes the network grow with its load. Expansion is a new feeder from the substation. Reinforcement is a rebuilt line or second circuits, a replaced or parallel service transformer, a larger rating of a SMART-DS voltage regulator, or a line voltage regulator. Phase rebalancing can run first; it builds nothing. The planning limits tell the run when the network has to grow. The run reports what it built as quantities. It holds no costs.

Network growth runs inside the Phase 7 deploy of each circuit folder, with growth on and network_growth.mode other than "off". The tracked mode is as_needed, so a run with growth_years above 0 grows its network unless the caller sets mode: "off". With growth_years: 0 nothing of it runs and nothing is written. Nothing is drawn: every choice is computed from the last solve, with ties broken by element name, so the same inputs give the same outputs.

# my_settings/growth.yaml: year 10, report the limits and build nothing
growth_years: 10
network_growth:
  mode: "off"

Rounds

  • Round 0 is the solve of the grown circuit as built. The EV charging shapes and, under storage_rule: schedule, the battery schedules are set before it and kept in every later round. The load of a circuit folder is therefore the same in every round, and only the network changes. ASSUMPTION: a controller that sees the grown network would shift charging a little.
  • The planned round: the items of carry_forward and planned for the circuit folder are all applied after round 0, and the circuit is solved again. This round does not count against max_rounds.
  • Under as_needed, up to max_rounds rounds follow. Each round tests the limits on the last solve, applies the first step that applies, and solves again. A round in which no step applies ends the rounds.
  • If the solve after a step does not converge, the step is undone, the files of the last converged solve stand as the final ones, and the rounds end with a [WARN] line.
  • After the last round, every limit still over, apart from voltage_band, is one [WARN] line with its count and worst element. The exit code stays 0.
  • The limits are tested on each circuit folder's own window solve, with its EVs, PV and storage.

Existing equipment is touched only when it is over its limit. New and rebuilt equipment is sized so that the peak that called for it is at most sizing_percent of its rating.

Keys

Key Values Meaning
mode "off", planned, as_needed; default as_needed "off": the limits are reported and nothing is built. planned: only the items of carry_forward and planned are built. as_needed: those items first, then what the limits still call for. Keep the quotes on "off": off without quotes is a boolean in YAML
steps a list of new_feeder, reconductor, service_transformer, regulator_rating, regulator; default all five in this order The as-needed steps in their order. A step left out never runs
new_feeder_regulator copy, none, skip; default copy A new feeder on a circuit whose head 1 is a voltage regulator: behind a copy of the head regulator and its RegControl, at the substation bus without a regulator, or none at all (see "A head on a voltage regulator")
rebalance_phases true, false; default false true: single-phase laterals are moved to the lightest phase before any other step, once per circuit folder
open_point switch, switch_then_bus, bus; default switch Where a new feeder takes over: an existing switch, a switch or else any three-phase medium-voltage bus, or any such bus
head_metric largest_phase, three_phase_kva; default largest_phase The measure of a head against head_limit_percent
sizing_percent above 0, at most 100; default 75 The loading of new and rebuilt equipment at the peak that called for it
max_rounds whole number, 0 or above; default 5 Rounds of as-needed steps after round 0
catalog region, substation, feeder; default region The SMART-DS feeder folders whose LineCodes and transformer ratings a step may use
carry_forward null or a path A network_growth_built.yaml of an earlier planning year or of the other season of the same case
planned a list of items Items in the format of network_growth_built.yaml

run_case.py checks every key before any phase. A step name outside the five or given twice, a boolean as mode, and mode: planned without an item each stop with one [FAIL] line.

What is tested

All tests use the last solve, over all its steps.

  • A line is over when its largest phase current exceeds line_limit_percent of the normamps of its LineCode. Lines of 1 m or less, disabled lines and lines without a rating are never tested, never call a step and are never rebuilt.
  • A head is the first element of a path from the source bus: the line or the voltage regulator that Monitor m1 watches, every express line of a new feeder, and every second circuit of such a line. A head is over when its measure exceeds head_limit_percent. Under largest_phase the measure is the largest phase current of the head line over its normamps. Under three_phase_kva it is the head's kVA over normamps x base kV x sqrt(3).
  • A transformer is over when its peak kVA exceeds transformer_limit_percent of its kVA.
  • A customer is under the band when any step of any of its Load lines is below the low value of the planning band. EV legs are left out. Voltage above the band is reported and calls no step.

The catalogue

Phase growth writes the catalogue once per run to <ws>/growth/network_catalog.json. catalog: region reads every feeder folder under the folder that holds the topology's substation folder. substation reads the feeder folders of the substation folder. feeder reads each feeder alone.

  • Lines: the LineCodes in use by lines longer than 1 m, by phases, level and construction, with normamps and the LineCode statement. The level is medium voltage when both buses of a line are medium-voltage buses (see "Voltage regulators": a regulator is crossed, any other transformer is not), else low voltage. ASSUMPTION: the construction is read from the LineCode name, _OH_ for overhead and _UG_ for underground, as SMART-DS names its codes; a name with neither shows no construction, and such a line is never rebuilt with another code.
  • Transformers: the kVA ratings in use, by phases and winding voltages, with one transformer statement each.
  • The substation: the transformers of the topology's substation folder and the vreg, band and ptratio of its RegControl.

A statement comes from the circuit's own feeder when it defines the name or rating, else from the first feeder folder in sorted order that does. A LineCode new to a circuit is appended to the LineCodes file of its ModifiedCircuitData/.

The steps

rebalance_phases comes first when it is true. Then the steps of steps run in their order. ASSUMPTION: the order is fixed, capacity before voltage, so the result is a rule-based plan and no least-cost plan; another order builds other equipment.

Phase rebalancing. It applies when a head or a three-phase medium-voltage line longer than 1 m is over its limit. Per head, at the step of its largest phase current, the candidates are the single-phase medium-voltage laterals the head feeds, each with the current of its first line at that step. The rule takes the heaviest phase H and the lightest phase L of the head. Among the laterals on H it moves to L the one that leaves the smallest max(I_H - c, I_L + c), c being its current, when that lowers the largest of the three head phase currents. It repeats until no move does. A move rewrites the phase node of every medium-voltage line, transformer primary and medium-voltage element of the lateral; the secondary side keeps its nodes. A lateral that holds a voltage regulator is never moved, because the move rewrites bus=, bus1= and bus2= values only. ASSUMPTION: a single-phase lateral can be moved to another phase at its tap with no change to its lines or transformers. The rule balances the head at its peak step, so other steps of the window can end less balanced.

New feeder. It applies to a head that is over its limit while the catalogue holds no larger code for its line, or that feeds a stuck line: a three-phase medium-voltage line longer than 1 m over its limit with no larger code of its phases, level and construction. One feeder is built per round, for the head with the highest measure. The rule works phase by phase, at the step of the head's largest phase current.

  1. What must be lost on a phase is the largest, over the head (when over) and the stuck lines, of the element's current on that phase less its limit percent of its normamps.
  2. Under switch the candidates are the closed three-phase medium-voltage lines the head feeds with switch=y or a length of 1 m or less. A candidate lies beyond every stuck line and carries on every phase at least what must be lost there. A line with second circuits is one candidate with the sum of their currents, and all its circuits are opened together. A line that a CapControl, StorageController or RegControl watches is never a candidate. When no candidate exists, the stuck line farthest from the source bus leaves the set and the search runs again.
  3. The rule keeps the candidates whose largest phase current is at most sizing_percent of the normamps of the express LineCode, or else those within head_limit_percent. It takes the one with the smallest max(largest phase of the old head after the transfer over its normamps, largest phase of the new head over its normamps). A tie goes to the shorter express line, then to the name.
  4. The new feeder is one express line with the LineCode the head line had in round 0, three-phase, from the source bus to the far-side bus of the chosen element. Its length is the line distance from the source bus to that bus along the existing route. The chosen element is disabled. The express line gets Monitors h<k>m1 and h<k>m2 for head k, and their exports.
  5. Under switch, when no candidate passes, no new feeder is built for that head in the circuit folder, a [WARN] line says so, and its lines go to reconductor.
  6. Under switch_then_bus the search then runs over the three-phase medium-voltage buses the head feeds. Each bus stands for the line that feeds it. If none passes step 3, the candidate with the smallest maximum is taken whatever the limits, and a later round may build another feeder. Under bus the candidates are the buses from the start.

ASSUMPTION: the new feeder is one express line along the existing route and serves nothing on the way. A real route can be longer, and the voltage beyond the open point then lower.

Rebuilt lines (reconductor). Every line over its limit is rebuilt, and so is every head over its limit. For a line with peak current I, the rule takes, among the catalogue codes of its phases, level and construction with a larger normamps, the smallest whose normamps x sizing_percent / 100 is at or above I. If none is, it takes the largest when I is within line_limit_percent of its normamps. The line keeps its length and buses. If no code passes, the line takes the largest code available to it (its own when none is larger) and second circuits: n circuits in all, n = ceil(I / (normamps x sizing_percent / 100)), the added ones named <line>_ng<j>.

Worked example. A three-phase medium-voltage overhead line with a code of 200 A peaks at 230 A. The catalogue holds overhead codes of 300 A and 400 A for three-phase medium voltage. At sizing_percent: 75 the 300 A code carries 225 A and the 400 A code 300 A. The line takes the 400 A code and then peaks at 58 percent of its rating. With only the 300 A code in the catalogue, 230 A is within the limit of that code, so the line takes it. At a peak of 460 A neither code passes: the line takes the 400 A code and ceil(460 / 300) = 2 circuits.

Service transformers. Every transformer over its limit is replaced. For a peak of S kVA, the rule takes, among the catalogue ratings of its phases and winding voltages above its kVA, the smallest with kVA x sizing_percent / 100 at or above S. If none is, it takes the largest when S is within transformer_limit_percent of it. The transformer is replaced by the catalogue statement of that rating under its own name and on its own buses, winding by winding. If no rating passes, it takes the largest rating available to it and parallel units: n units in all, n = ceil(S / (kVA x sizing_percent / 100)), the added ones named <transformer>_ng<j>. A voltage regulator is never a service transformer: it stays a row of loading_transformers.csv and of the row transformer of planning_limits.csv, and regulator_rating handles it.

Regulator ratings (regulator_rating). Every SMART-DS voltage regulator over its limit takes a larger rating. A regulator is over when its row of loading_transformers.csv exceeds transformer_limit_percent, or when it is a head whose measure exceeds head_limit_percent. A line regulator of network growth is left out. For a peak of S kVA, the rule takes, among the catalogue ratings of its class (its phases and winding voltages) above its kVA, the smallest with kVA x sizing_percent / 100 at or above S. If none is, it takes the largest when S is within transformer_limit_percent of it. The catalogue statement of that rating replaces the regulator's statement in place, under its own name and on its own buses; its RegControl names it and stays as it is. If no rating passes, nothing is built, and the run writes one note per circuit folder with the regulator, its percent and its class. ASSUMPTION: a regulator is never paralleled, because two regulators in parallel need coordinated controls the release does not give. The catalogue reads the feeder folders as released, so a regulator whose winding kV regulator_settings_from_voltage rewrote may find no rating of its class.

Line voltage regulator. It applies when customers are under the band. The rule takes the head that feeds the most of them. The line is the deepest medium-voltage line on the path of every one of them, from the source bus to the customer's service transformer primary, or to its own bus at medium voltage. The step does not apply to a head whose line found this way starts at the source bus, already carries a regulator of network growth, or starts at a bus fed by any voltage regulator; the next head is tried. Nor does it apply when a voltage regulator, of SMART-DS or of network growth, sits between that line and any of those customers. The run then writes a note that names the head, the regulator nearest the line and the count of those customers behind it, and the next head is tried. The regulator sits at the upstream end of the line: a new bus <upstream bus>_ngreg<k>, the line's upstream end moved to it, and per phase one single-phase two-winding transformer with a RegControl on its winding 2. Both windings are at base kV / sqrt(3) and the kVA is the line's normamps x base kV / sqrt(3). A line with second circuits moves with them, and the regulator takes their summed normamps. On a line of 1 m or less, a switch, fuse or recloser, the regulator takes the rating of the conductor beside it: the largest of the line's own summed normamps and, for each branch at either end of the line, the summed normamps of the branch's medium-voltage lines longer than 1 m. The rating is read on the circuit of the round the regulator is built in. One regulator is built per round. ASSUMPTION: the regulator takes XHL 0.01 and %LoadLoss 0.01, the values of the regulator of the IEEE 13 node test case distributed with OpenDSS (https://github.com/dss-extensions/electricdss-tst/blob/master/Version8/Distrib/IEEETestCases/13Bus/IEEE13Nodeckt.dss), and the vreg and band of the substation regulator of its SMART-DS topology, with the OpenDSS default taps and delays. It takes the ptratio of that regulator when it is within 1 percent of the unit's winding kV x 1000 / 120, and that value otherwise, since OpenDSS divides the winding voltage by ptratio and holds the result at vreg, whose default is 120 V (https://opendss.epri.com/Properties23.html); the run then prints one [growth] line with both values. A regulator with line-drop compensation would hold a different voltage downstream. A substation folder without a RegControl makes the step not apply.

A head on a voltage regulator. When Monitor m1 watches a voltage regulator, the regulator is a head of its own: its upstream bus is the bus of its first winding, its downstream bus the bus of its second winding, and its normamps and phase currents are those of its row of heads.csv. Phase rebalancing, rebuilt lines, service transformers and line regulators work behind it as on any feeder. The head is no line to rebuild; regulator_rating may give it a larger rating. new_feeder_regulator sets the new feeder of such a circuit:

  • copy: the head qualifies as a head line does, over its limit while the catalogue holds no larger rating of its class, or feeding a stuck line. The new feeder k starts behind a copy of the head regulator on the substation bus: Transformer.ng_express_<k>_reg, the head regulator's statement with winding 1 on the bus of its winding 1 and winding 2 on the new bus ng_express_<k>_bus with the nodes of its winding 2, appended to its file. Its RegControl, renamed ng_express_<k>_reg with transformer=ng_express_<k>_reg, goes after the existing lines of the file that holds it; a head regulator without one gets its copy without one, and the round notes it. The express line runs from ng_express_<k>_bus.1.2.3. The Monitors h<k>m1 and h<k>m2 watch the copied regulator, so head k is a regulator head of its own with the rating of head 1. The new bus takes the coordinates of the source bus.
  • none: the head qualifies the same way, and the express line starts at the source bus, as on a line head, with its Monitors on the line.
  • skip: no new feeder is built on such a circuit, and its stuck lines go to reconductor. An item of carry_forward or planned with step new_feeder on such a circuit stops the run with a [FAIL] line that names the feeder and says that its head is a regulator.

Under copy and none the express line takes the LineCode of the enabled three-phase line that leaves the head regulator's winding-2 bus with the largest normamps, the first name on a tie. Step 3 of "New feeder" takes as the new head's normamps that of head 1 under copy and that of the LineCode under none. A circuit without such a line builds no new feeder, and the run prints one [WARN] line. ASSUMPTION: on a circuit whose head is a voltage regulator, a new feeder starts behind a copy of that regulator and its RegControl at the substation bus, and its express line takes the LineCode of the line that leaves the head regulator. The circuit is held at the regulator's voltage, so its new feeder is held the same way; under none the new feeder sees the voltage of the substation bus.

When the head is over head_limit_percent and no step of the settings can act on it (new_feeder is not in steps or new_feeder_regulator is skip, and regulator_rating is not in steps), the run writes one note per circuit folder that head k is a regulator over its limit and that nothing is built at the head. Under new_feeder_regulator copy or none, new_feeder builds nothing at a head regulator over its limit when the catalog holds a larger rating of its class and no line over its limit behind the head calls for a new feeder. When regulator_rating is not in steps either, the run writes one note per circuit folder that names the regulator, its percent and its class, and says that nothing is built at the head. A regulator over transformer_limit_percent gets a note that it is not replaced when network growth built it, or when regulator_rating is not in steps. The notes on regulators go to a [WARN] network growth: line and to the note column of network_growth_rounds.csv.

Substation units

Phase 8 records in substation_limits.csv, per mix, how many transformer units the substation needs. The power flow is unchanged. units_existing and unit_kva come from the transformers of the substation folder. When the row is over substation_limit_percent, units_in_all = ceil(peak kVA / (unit_kva x sizing_percent / 100)), at least units_existing. units_added is the difference. Under mode: "off" the last two columns stay empty. ASSUMPTION: a new unit copies the largest transformer of the substation folder; the substation transformer is in no solved circuit, so its losses and its regulator are outside the power flow.

Carrying a plan forward

Every run with a mode other than "off" writes what it built as items, per circuit folder in ModifiedCircuitData/network_growth_built.yaml and for the whole run in <ws>/7_circuit_instantiation/network_growth_built.yaml. An item names its feeder, its mix, its step and its elements, enough to build it again without a solve:

- {feeder: <feeder>, mix: <mix>, step: rebalance_phases, lateral: <root bus>, to_phase: 2}
- {feeder: <feeder>, mix: <mix>, step: new_feeder, open: <line>}          # or cut_bus: <bus>
- {feeder: <feeder>, mix: <mix>, step: reconductor, line: <line>, linecode: <code>, circuits: 1}
- {feeder: <feeder>, mix: <mix>, step: service_transformer, transformer: <name>, kva: 50, units: 1}
- {feeder: <feeder>, mix: <mix>, step: regulator_rating, transformer: <name>, kva: 16000.0}
- {feeder: <feeder>, mix: <mix>, step: regulator, line: <line>}

carry_forward is the path of such a file, absolute or relative to the settings folder. Its items for the same feeder and mix are applied first, then the items of planned, in file order. An item of planned may give mix: all. The built file adds round to each item; a reader ignores it. An item whose feeder is not in the case is left out with one line. An item whose element is not in the circuit, or whose code or rating is not in the catalogue, stops the run with [FAIL]. A later run rebuilds a carried element again when it is over its limit again.

Outputs

Per circuit folder, in ModifiedCircuitData/: network_growth_rounds.csv (one row per round), network_growth.csv (one row per built item), network_growth_built.yaml, loading_phase_currents.csv, and the column built in loading_lines.csv and loading_transformers.csv. The files of ModifiedCircuitData/ describe the final solve. Before a step is applied, the tables, the head Monitor exports and the .dss files of the last solve are kept in ModifiedCircuitData/round_<round>/; round_0/ holds the grown circuit as built and exists only when an item is built. Phase 8 writes network_growth_summary.csv and the merged network_growth_built.yaml, and adds heads and network_growth_rounds to circuit_summary.csv and the summary rows. With more than one head, feeder_head_kva of a circuit is the sum of the ratings of its heads, and the data rows of aggregate_m1.csv and aggregate_m2.csv hold the sum over the heads; one extra set of rows per head carries row_type head. docs/outputs.md lists every file and column.

Sources

  • sizing_percent 75 and max_rounds 5: NREL DISCO documentation, Upgrade Cost Analysis, https://natlabrockies.github.io/disco/analysis-workflows/upgrade-cost-analysis.html (line and transformer design loading of 0.75 per unit; an upgrade iteration threshold of 5). A second source for 75 percent: City of Riverside Public Utilities, Distribution Design Manual, DDM-1 Feeder Systems, section 1.2 J, https://www.tellusventure.com/downloads/riverside/DDM-1%20Feeder%20Systems%20.pdf.
  • The kinds of step and their order, capacity before voltage: the same DISCO page (thermal upgrades before voltage upgrades; a higher-rated item of similar configuration from a catalogue, else similar equipment in parallel; a new regulator on a common upstream node of the buses with violations) and DDM-1 section 1.2 D (line regulators, reconductoring, load transfer and a new circuit as corrective actions).
  • A new feeder at an existing switch: DDM-1 sections 1.1 A and 1.2 E (sectionalizing and tie switches carry load transfers).
  • The regulator model: the IEEE 13 node test case distributed with OpenDSS, URL above.

Known limitations

  • Network growth runs its steps in a fixed order. The result is a rule-based plan and no least-cost plan.
  • Network growth builds no new substation. Substation transformer units are records, and the power flow does not hold them.
  • Network growth reports quantities. It holds no costs.
  • A feeder is never extended outward to serve a new district: an extension block attaches to an existing bus.
  • Voltage above the planning band is reported and left alone.
  • Under storage_rule: simple or tuned with storage_view: feeder, the live storage controller watches the first head only after a new feeder is built.
  • Under storage_rule: simple or tuned with storage_view: transformer or building, each storage controller watches its transformer or line by name. When network growth adds parallel units to that transformer or second circuits to that line, the controller sees the flow of the original element only, and no [WARN] line says so.
  • Phase rebalancing balances the head at one step, its peak step.
  • Customers under the voltage band on branches that share only the head line stay under the band, because the regulator step builds no regulator at the source bus.
  • Network growth sets no limit on the second circuits of one line or the parallel units of one transformer. NREL DISCO limits both to 4 (https://natlabrockies.github.io/disco/analysis-workflows/upgrade-cost-analysis.html).
  • The circuits as built can hold lines and service transformers over a planning limit before any growth. A run with network growth rebuilds those too, so part of what it builds answers the circuit as built.
  • The pipeline does not check whether a Fuse of the SMART-DS feeder files opened during a solve. A line that network growth rebuilds keeps its fuse and the fuse's rated current.
  • A voltage regulator is never paralleled. One over its limit with no larger rating of its class in the catalogue is reported and stays as it is.
  • The catalogue reads the feeder folders as released, without the repairs. A regulator whose winding kV regulator_settings_from_voltage rewrote may then find no rating of its class.
  • A lateral that holds a voltage regulator is never moved by phase rebalancing, and neither is a block copied from it.
  • A lateral that holds a voltage regulator is one candidate among all the laterals that fit when a block is drawn, so under regulators.block_copies: with_control it is seldom copied, and a run can build no block with a regulator.
  • The path loading of a block leaves out the voltage regulators on the path. The path impedance counts each regulator's leakage reactance and leaves out its resistance.
  • None of the voltage regulators of the SMART-DS v0.9 Full Texas 2018 release writes XHL, X12 or XscArray, so each runs on the OpenDSS default reactance of 7 percent (https://cimhub-opendss.readthedocs.io/en/latest/schema_ref/Xhl/; for example https://oedi-data-lake.s3.amazonaws.com/SMART-DS/v0.9/2018/Full_Texas/P175U/scenarios/base_timeseries/opendss/p175uhs2_1247/p175uhs2_1247--p175udt21772/Transformers.dss).
  • The line regulator step skips a head whose line starts at a voltage regulator, and a head whose line has a voltage regulator between it and any of the customers under the band. Customers under the band behind a voltage regulator with no medium-voltage line after it get no line regulator.
  • An item of carry_forward or planned with step regulator is built on the line it names, also when a voltage regulator feeds that line or sits between it and the customers under the band. The checks of the line regulator step apply only to the regulators that network growth chooses itself.
  • The simulation horizon is horizon_days days of 96 fifteen-minute steps each, one day at horizon_days: 1. Day X is the peak day of the building curves, the grown curves with load growth on; OpenDSS solves the window around it and no other day. The deploy script, pfs_ev_base_profiles.py and the max-day script keep their names.
  • The building curves of the data year start at 00:15 on 1 January, so a cut of 1 January, as day X or as a window day, takes as its last step the year's last row, stamped 00:00 on 1 January of the next year (window_rows in 5b_profile_generation/find_max_day_curve_impl.py).
  • Homes use EULP ResStock profiles on TMY3 weather. Commercial buildings use EULP ComStock profiles on 2018 weather, and SMART-DS solar data is for 2018.
  • PV and storage sizes follow sourced shares of roof area and annual use, applied to every host of a segment alike. Real systems vary around those shares, and the commercial median PV size of the default cases is below the LBNL median for non-residential systems. See der_sizing in pipeline_config.yaml.
  • PV is sized on the baseline building's annual use, before any heat pump or EV, so a home in the dm or un group keeps the PV of its baseline building.
  • Under roof_area_source: floor_stories the roof of an apartment is its floor area over the building's stories, so each unit of a multi-family building gets a roof share. Under metadata many apartment units have no roof.
  • Storage watches the feeder head, a service transformer or a service line. A substation view of storage would need both feeders in one solve.
  • Under storage_view: building with storage_layer: add_kw, each view adds the PV and cars of the hosts whose bus its line feeds, and leaves out those of hosts further along that line. storage_layer: solve measures them.
  • ResStock assigns its own existing PV by market distributions, https://natlabrockies.github.io/ResStock.github.io/docs/resources/explanations/PV_System_Assignment_and_Distributions.html. Whether ResStock total electricity is net of that PV is not modelled here.
  • A StorageController shares the kW it needs over every battery of its view and holds the watched power within a band around its target (storage_kw_band_pct, wider than the OpenDSS default) and asks for part of the kW it needs in each iteration (storage_disp_factor), so that fleets of many small batteries settle. A view where most batteries are full or empty approaches its target in many small steps; storage_max_control_iter sets how many a time step may take.
  • Under storage_rule: simple or tuned, a time step that needs more control iterations than storage_max_control_iter stops the OpenDSS solve, for example under tuned with storage_standby_element: idling. The deploy then stops with a message about missing monitor exports, which names neither the step nor the controller.
  • Storage shaves the forecast peak of its view with a plan computed from the day's curve. Optimised or co-optimised dispatch of batteries is outside this tool.
  • Batteries serve their view of the grid. Household self-consumption control, which most behind-the-meter batteries follow, is not modelled.
  • Under schedule_start: best each battery starts with the energy that best serves day X and aims to return to it at every midnight. A one-day run (horizon_days: 1) returns to it exactly, as if every day had the same curve, and so assumes the day before left that energy. A longer window plans each day on its own curve from the energy the day before left, and assumes only that the day before the window left the starting energy.
  • Under storage_rule: simple nothing returns a battery to its starting energy at the end of the day, so a battery can end a day with more or less energy than it started with.
  • Each case takes its PV shape from one SMART-DS solar site of the donor's region, on the day the circuit runs on: the feeder's baseline peak day under per_group, the circuit's day under per_circuit. With horizon_days above 1 each day of the window takes the shape of its own month and day. See pv_profile in configs/donor_registry.yaml.
  • The docs are Markdown read on GitHub. The Sphinx build needs myst_parser.
  • The release is tested on Windows with the OpenDSS COM interface. The Linux setup of docs/LINUX_SETUP.md is not tested at this release.
  • gather_m2_cases.py, validate_2x2.py and gen_results_table.py read configs/local.yaml only and ignore --settings (gen_results_table.py takes --runs-root).
  • --phase runs on one workspace each take the --settings folder of their own call. run_case.py does not compare it with the folder of the earlier phases, apart from the growth plan check, so resolved_case.yaml records only the last call's folder and <run_dir>/settings/ keeps the files of earlier folders beside it.
  • Phase 8 writes problem_circuits.txt only when a circuit folder has a problem and never removes an earlier one. After a rerun of Phase 8 that succeeds, the file still lists the problems of the earlier run.
  • Heating labels are dealt per building profile, and buildings serve different numbers of customers, so the realized customer shares can differ from the mix. Under heating_label_unit: customer both the building shares and the customer shares can differ, because a building shared by several customers takes the group of the last customer dealt.
  • With load growth on, heating_assignment__FULL.csv and heating_assignment__FULL.json list only the loadshapes the feeder already had. The heating group of a loadshape new to the feeder is in new_shape_labels of scenario_assignments.json.
  • A loadshape whose monthly peaks match no building within the largest tolerance takes the buildings of the next 5 % step that matches, so its profile is further from its SMART-DS peaks. The Tolerance column of df_com_matches_out_<ST>.csv and df_res_matches_out_<ST>.csv records the step reached.
  • Phase 4 reuses a building only when every building that matches a loadshape is already taken, so two loadshapes of one feeder can run the curve of the same EULP building.
  • Phase 4 draws every representative building from one random stream seeded by random_seed, commercial buildings first and homes after. A change in the candidates of one loadshape or building type can therefore change the buildings drawn for others.
  • The forecast error of the valley rules is hourly and independent from hour to hour, while real forecast errors are correlated over hours.
  • Under valley_fill_transformer the forecast error of each service transformer follows the scaling law of Sevlian and Rajagopal (https://arxiv.org/abs/1404.0058v3), which was fitted on aggregates of many customers. The tool applies it without a cap to transformers with a small mean load, so a lightly loaded transformer gets a large relative error.
  • Controlled cars are placed one at a time in order of plug-in time, so later cars get the valleys that earlier cars leave.
  • The start spread of offpeak_start is an assumed normal spread, 60 minutes on a typical day and 15 on a stress day.
  • Battery standby comes from lab tests of 26 German residential systems and is applied to every battery, commercial ones included. A commercial battery takes the home values per kW of a 5 kW system, as a percent of its kW. Each battery draws its discharged-state standby at every step of the day. Under storage_standby_element: load the grid supplies the standby also while a battery discharges, where OpenDSS %IdlingkW would take it from the battery.
  • The stress day changes behaviour (the share of cars charging, the months drawn, the check curve, the forecast horizon, the start spread), never hardware.
  • The tariff is one utility's rate per donor state: its weekday schedule, and with horizon_days above 1 its weekend schedule on Saturdays and Sundays. The saved file records whether the rate was current when it was fetched, and offpeak_start uses a rate that is no longer current as it is.
  • Public EV charging is not modelled.
  • Several work cars can share one office load, because the office is drawn with replacement among the circuit's commercial loads (the TX circuits hold 20 and 22 commercial loads).
  • An EV WATTS office session is one plug-in at a shared charger, so it can cover less than a car's whole stay at work.
  • Cars leaving the feeder for work are taken to balance cars arriving from other feeders: a work car charges at a commercial load of its own circuit.
  • Homes heated by electricity run ResStock upgrade 1 in the dm group, the same profile as in the un group. The dm homes that still run baseline are homes the measure does not reach: fuel-heated homes that the ResStock 2024 Release 2 known issue on measure applicability leaves without the measure (https://natlabrockies.github.io/ResStock.github.io/docs/resources/explanations/Issue_2024_2_Measure_Applicability.html), homes with a shared HVAC system, and homes heated by a fuel other than natural gas, propane or fuel oil, which Measure Package 4 does not cover.
  • Load growth multiplies every home by the AEO2026 use per household, which holds the AEO's own projection of the heating equipment of homes (https://www.eia.gov/Outlooks/Aeo/excel/aeotab4.xlsx). The dm and un groups add ResStock heat-pump upgrades on top, so part of the electrification of heating can count twice.
  • NC cars draw EV WATTS sessions of chargers in the South Atlantic census division and TX cars of chargers in the West South Central division, because EV WATTS gives no state.
  • EV WATTS sessions are from 2019 to 2022 and come from early adopters.
  • NHTS drivers are from 2016 and 2017 and drove all vehicle types (car, van, SUV, pickup).
  • kWh per mile is the average of the model year 2024 new battery EVs, one fleet average that does not vary with speed or season.
  • Under nhts_days a car plugs in when it arrives home at its last arrival, with no delay.
  • The share of cars charging counts one car per residential charger.
  • The share of cars charging on a day type counts each EV WATTS residential charger as in service from its first to its last session of that day type, and leaves out a charger with no session of that type (charging_share in 7_circuit_instantiation/deployer_modules/ev_cars.py; EV WATTS, https://doi.org/10.15483/1970735). The share can then be higher than one counted over each charger's whole service time.
  • EV WATTS timestamps are read as the charger's local clock time.
  • NHTS vehicle-days that drive but neither end nor start at home are left out of the draw, and so are vehicle-days with a driver trip faster than 85 mph, taken as recording errors.
  • At horizon_days: 1 a plug-in window that runs past midnight wraps onto the first intervals of the same day. With horizon_days above 1 it runs on to the next day; only the part after the window's last midnight is left out, and its energy is reported as owed.
  • The check curves in 7_circuit_instantiation/data_ev/, used by session_rows, are UK home charging from the Electric Nation trial, processed by the University of Melbourne for an Australian project (Team-Nando EV-Demand-Profiles).
  • An EV WATTS Level 2 car charges at its session's mean power, which can differ from 7.2 kW.
  • Under per_circuit, a case-season takes about twice as long and needs more disk than under per_group.
  • The source monitor m1 reads the source voltage setpoint. Load voltages come from the per-load record (load_voltages.parquet, see docs/outputs.md).

Key Handoffs

Artifact Producer Consumer
commercial_data_SELECT_STATES.csv, residential_data_SELECT_STATES.csv 1_data_provenance cluster pipeline_state 3_tolerance_matching/phase3_match.py
{STATE}_required_parquets_per_feeder_dm.csv 5d_scenario_controls/get_scenario_csv_controls.py 5b_profile_generation/phase5b_variants_dm.py
{STATE}_parquet_and_bldgs_dm.csv 5d_scenario_controls/get_scenario_csv_controls.py 5c_csv_conversion/parquet_to_csv.py
profiles_use_bench/ 7_circuit_instantiation/instantiate_circuits.py 7_circuit_instantiation/power_flow_sim_daily_EV_STO_DG_deploy.py
0_experimental_design/mixes_fixed.yaml (three hand-set mixes, tracked) Set by hand bridge_phase5c_to_phase7.py (Phase 7a) copies it to <ws>/7_circuit_instantiation/mixes.yaml, keeping the extension of the mixes file, after it removes any other mixes copy there; 7_circuit_instantiation/instantiate_circuits.py reads it and stops when that folder holds more than one copy

License

Apache-2.0

About

Open-data pipeline for coupling SMART-DS synthetic distribution feeders with End-Use Load Profiles (EULP) at the building-to-load level.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages